My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/14/2011 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2011
>
09/14/2011 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 11:50:35 AM
Creation date
6/25/2014 8:38:27 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/14/2011
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />18 <br />1. The city water system has adequate wells, storage, ef-and pipe capacity to <br />serve the subdivision, consistent with the Recommended Standards for Water Works, as <br />amended; <br />2. The water utility extension is consistent with the Lino Lakes water plan and <br />offers the opportunity for water main looping to serve the urban subdivision; <br />3. The extension of water mains will provide adequate water pressure for <br />personal use and fire protection; <br />4. The rural subdivision can demonstrate that each of the proposed lots can be <br />provided with a potable water supply; <br />(e) Waste disposal systems. A proposed subdivision shall be served with adequate <br />waste disposal systems when: <br />1. The urban sewered subdivision is located inside the city's MUSA or i <br />consistent with the MUSA allocation criteria; <br />12. The city has sufficient MUSA and pipe capacity to serve the subdivision if <br />developed to its maximum density; <br />• 23. The subdivision will result in a sewer extension consistent with Lino Lakes <br />• <br />sewer plan and capital improvement plan; <br />34. A rural subdivision can demonstrate that each lot can be served by an adequate <br />sanitary sewer disposal system; and <br />45. A rural subdivision with a proposed communal sanitary sewer or water system <br />has an effective long range management and maintenance program with proper financing. <br />(Ord. 04 -03, passed 2 -24 -2003) <br />MUSAAL-LOCATION. note: We will no longer have a MUSA bank. <br />(1) MUSA availability and cot, <br />(a) The c <br />preliminary plat /phasing plan, <br />(b)- City approval of the plan shall constitute a co <br />al -plat approval according to the phasing plan. <br />(c) - -The t 3n-- fi ction shall se considered in the review of the-preliminary- <br />plat /phasing plan, <br />draft revisions to Chapter 1001 subdivisions draft September 2011 Page 18 of 77 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.