My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/13/2013 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2013
>
11/13/2013 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2014 1:13:51 PM
Creation date
6/26/2014 10:33:09 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/13/2013
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utilities <br />Public water, sanitary and storm sewer utilities shall be installed in conjunction with the <br />construction of Robinson Drive. <br />Public Land Dedication <br />The PUD amendment includes the creation of 11 additional lots and vacation of <br />approximately 0.58 acres of previously dedicated parkland. The vacated parkland would <br />be used to create 3 additional lots along Robinson Drive. The newly created lots would <br />be subject to the City's Park Dedication fee of $2,500 per lot. Additionally, the City <br />would need to be reimbursed for the value of the land dedication made at the original <br />time of approval. The value of the land dedication at the time of original approval was <br />established at $50,000 /acre. Assuming acceptance of this request, the following park <br />dedication requirements would need to be met: <br />0.58 gross acres — 0.04 acres wetland = 0.54 net acres <br />0.54 acres x $50,000 (value of land at time of dedication) = $27,000 <br />11 lots x $2,500 payment in lieu = $27,500 <br />TOTAL = $54,500 <br />Please note that the 0.58 acres includes wetland. Only upland can be used to calculate the <br />reimbursement amount. <br />On a separate note, unsuitable soils were used for fill material on approximately 3 -4 acres <br />of the dedicated parkland. The owner is responsible for correcting this situation. <br />Comprehensive Plan <br />Resource Management System <br />The Resource Management Plan identifies a north -south trail and greenway system in the <br />subject site area. An 8 foot wide trail is being installed the on the south side of Robinson <br />Drive. The greenway and wetlands are being protected via drainage and utility easements <br />or dedicated parkland. <br />Land Use Plan <br />As identified above, the land use is guided for medium density residential development <br />and is within the 1A Utility Staging Area. <br />Housing Plan <br />Key goals of the Housing Plan are to ensure housing development is compatible with <br />existing and adjacent land uses and provide accessibility to key community features and <br />natural amenities. The PUD provides a variety of housing stock from standard single <br />8 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.