My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/13/2013 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2013
>
11/13/2013 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2014 1:13:51 PM
Creation date
6/26/2014 10:33:09 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/13/2013
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Mr. Jason Wedel <br />November 5, 2013 <br />Page 3 <br />15. Note elevation of floodplain on plans. If fill is proposed within floodplain areas, provide <br />cut / fill volumes within the floodplain to demonstrate that no net fill will occur within <br />the floodplain. <br />16. Note how design infiltration rate was determined for infiltration basins. <br />17. Maintain 3' of separation from surface of infiltration areas to seasonal high groundwater <br />elevation. <br />18. Show perimeter of infiltration areas on plan or include note indicating square footage of <br />infiltration areas. <br />19. Verify high water elevation of south wetland and account for tailwater condition in model <br />if needed. <br />20. It appears that the "ditch to the east" does not flow to the "wetland south" as shown in the <br />proposed model. In order to clarify routing used in the model, revise node locations to <br />graphically depict relative location of subcatchments and basins (not needed to scale). In <br />addition to ponds and subcatchments, clearly show reach alignments and wetland basins <br />on drainage maps. Include wetland basins in the proposed conditions model. <br />21. Note that ATLAS 14 precipitation was used for analysis in Stormwater Management <br />Report narrative for future reference. <br />22. Curve Numbers used in the HydroCAD model should match standards outlined in <br />RCWD Rules. <br />23. Address how surface runoff on Pheasant Run South to the intersection of Old Birch Street <br />will be addressed. <br />EROSION CONTROL <br />24. Show location of rock construction entrance on plan. <br />This concludes our stormwater management comments at this time. If you or the applicant have <br />any questions regarding these comments, please contact Paul Hudalla at (763) 287 -7176 or <br />phudalla @wsbeng.com. <br />KA02029fi30V dmthlDoo \ EMOj_wedel stormwater comments 110513.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.