Laserfiche WebLink
Main Street Village <br />page 4 <br />14. The motor fuel station canopy may have contrasting color bands not to exceed an <br />accumulative width of four inches. A new design must be submitted for review prior to <br />approval by the P & Z Board. <br />15. The motor fuel station canopy lighting must be recessed. Details or fixture cut sheets for <br />the canopy lights must be submitted prior to approval by the P & Z Board. <br />16. Data must be submitted indicating the landscaped area of Lot 1, Block 2. <br />17. Information on the number of vehicles that the car wash can service in 30 minutes must be <br />submitted. <br />We will review the January 3 information to determine how items 13 -17 are <br />addressed. In addition, discussion at the December P & Z meeting noted that the car <br />wash building lacks distinctive bottom - middle -top features. A quick view of the new <br />plans show that the car wash site has been redesigned for a single bay wash instead of <br />two bays. Parking has been added as well. <br />18. Information on the location, area, and set up of the outdoor seating on Lot 2, Block 1 and <br />Lot 2, Block 2 must be submitted for review. <br />As recommended by the P & Z in December, we will not include the need for a <br />Conditional Use Permit for the outdoor seating for McDonald's or the coffee shop as <br />long as no waiter /waitress service occurs. Any use on the site that includes wait staff <br />service will require a CUP. <br />19. The submitted signage plan ( "Signage Specifications ") must be amended to comply with <br />the sign ordinance and monument signs must be located on plans. A revised signage plan <br />must be submitted for review prior to approval by the P & Z Board. <br />20. The submitted "Architectural Design Criteria" must be revised to ensure that the <br />requirements in the Zoning Ordinance, Section 3, Subd. 4.B.4., are fulfilled. <br />The January 3 information includes nothing that addresses items 19 & 20. <br />21. City Engineer review comments must be addressed to his satisfaction prior to approval by <br />the P & Z Board. <br />A new review dated January 2 is attached to this report. We will review the January 3 <br />information to determine how issues are addressed. <br />• <br />• <br />• <br />