My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/12/2000 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2000
>
07/12/2000 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 10:56:36 AM
Creation date
6/30/2014 2:30:10 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/12/2000
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Twin City Fab, Inc. <br />July 12, 2000 <br />page 3 <br />• Landscaping <br />Marmon Keystone and TC Fab to the east are coordinating their landscape plans. The <br />landscaping plan was not finished in time to be reviewed for this report. We expect to <br />have the landscaping plan in time for the P & Z meeting. <br />• Utilities <br />Sanitary sewer and water service exist on the north edge of the site. This site will <br />connect to the existing facilities. (The City vacated the 74th St. right of way on May 22 <br />but retained a drainage and utility easement.) <br />Stormwater management on this site includes a pond shared by the property on the west. <br />This common pond will serve both sites. Some of the stormwater facilities on the Twin <br />City Fab site will be constructed by Twin City Fab's contractor, while some will be <br />constructed by the current land owner as part of the ponding for the neighboring site and <br />land to the west of that. <br />Because of this, the design and review of these two sites requires coordination. <br />Unfortunately, the design of each site and the coordination between them is not at a point <br />where staff can recommend approval. <br />(City Hall lost power on Friday, July 7, due to a storm. This interfered with finalizing the <br />City Engineer's memo. The attached memo was preliminary, but gives some indication <br />of the unresolved issues. We will send a final memo before the meeting.) <br />• Parking <br />For light manufacturing, our code requires at least one parking spaces per 2000 sf of <br />gross floor area or one space per employee, whichever is greater. Currently, TC Fab has <br />12 full time employees and 5 part time. The office area requires 3 spaces plus one space <br />per 200 sf. For the purposes of calculating parking spaces, the ordinance requirement is <br />to use 90% of the gross building area. <br />gross <br />area <br />90% <br />code <br />requirement <br />required <br />spaces <br />total footprint <br />19,200 sf <br />office <br />2,040 sf <br />1836 <br />3 plus <br />one space per 200 sf <br />12 <br />mfg /warehouse <br />17,160 sf <br />15,444 <br />2000 <br />g <br />17 <br />one space per sf <br />or one per employee <br />TOTAL <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.