My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/12/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
12/12/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2014 3:43:22 PM
Creation date
7/2/2014 12:21:56 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/12/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Street Village <br />page 10 <br />• We also will need to establish the locations of monument and/or pylon signs, and show them <br />on the revised plans. <br />• <br />Park Plan and Park Dedication: The parks plan shows Natural Resource Protection <br />Areas corresponding to the locations of wetlands as revealed by the wetland delineation. <br />These are wetland areas that will be protected by existing wetland law. As noted above, the <br />wetland mitigation plan has been reviewed by the Rice Creek Watershed District. The <br />protected wetlands will be covered by a drainage and utility easement. <br />In August, the P & Z expressed the desire to see pedestrian and bike access to and through the <br />project. This is worth examining because of the trails existing and planned on the abutting <br />roads. The Park, Greenway, and Trail System plan shows a trail along Otter Lake Road and a <br />bikeway and linking trail along Main Street. There is an existing trail on the east side of Otter <br />Lake Road. There is an existing trail on the north side of Main St. starting at Otter Lake Road <br />and going east. There is no trail currently abutting the project site. The Main Street/Otter <br />Lake Road intersection is a good crossing point because it is signalized. However, getting to <br />the project site should be addressed. Pedestrian and bicycle access to and circulation within <br />the project is not indicated on the submitted plans. <br />Park dedication for commercial development is $2175 per acre. For development that <br />includes 24 acres of upland, this would be over $52,000. Dedication cash can be credited for <br />trail construction that is part of a development project. <br />Conditional Use Permits <br />Several CUPS are needed for the project: a motor fuel station, a car wash, and two outdoor <br />seating areas. The actual requirements in the Zoning Ordinance are attached to this report or <br />reference. <br />Motor Fuel Station: Section 7, Subd. 3.H.7. lists the requirements for a motor fuel station <br />conditional use permit. The submittal complies with many of the CUP requirements. <br />Unresolved issues are discussed below. <br />The building meets the architectural standards. However, the submitted canopy design does <br />not comply with our requirements on the following points: <br />• The fascia cannot be more than three feet in vertical height and the submittal is almost <br />four. <br />• The canopy may have contrasting color bands not to exceed an accumulative width of <br />four inches. The submittal shows two bands of about six inches each, totaling <br />approximately twelve inches. <br />• The canopy lighting must be recessed. We do not have details or fixture cut sheets for <br />the canopy lights. <br />The ordinance requires that at least 25% of the lot used exclusively for the gas sales facility <br />shall be landscaped. The car wash is on the same parcel, so some judgment will be needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.