Laserfiche WebLink
• <br />• <br />Pine Glen <br />page 3 <br />Access and Circulation: Access to the site is provided via a public street entering <br />the site east from Lake Drive. The location of the street does not immediately create a <br />direct intersection with a street traveling west of Lake Drive. This is a situation that will <br />need to be remedied in the future. The applicant has shown on the plat a ghost plat <br />indicating that Vicky Lane could be re- routed south to align itself with the proposed <br />Street A of Pine Glen. Though this is probably not the final alignment this road will take, <br />it does demonstrate the intent of the city and the potential to align the intersection. This <br />will need to be enforced on the property adjacent to the west side of Lake Drive at such <br />time that it is developed. <br />Secondary access to the site is provided immediately through the existing Lois Lane. <br />This is intended to provide an immediate secondary access to eliminate the development <br />of an overly long cul -de -sac situation. This is a sound planning fundamental and has <br />been the direction of the Planning and Zoning Board and the City Council. This is <br />clearly designed to be a secondary access point and will allow the current residents of <br />Lois Lane another access as well. <br />Future access points have been planned both to the north through James Street and to the <br />south through the undeveloped right of way of Dupont Avenue. A temporary cul -de -sac <br />will be required on the southern terminus of what is currently labeled Street B. <br />The southern access to Dupont Avenue is being planned to allow the property owners to <br />the south the potential to divide their lots in the future. Many things would need to occur <br />in order for this to happen. It would require that utilities be hooked up to the existing <br />homes as well as the future homes; and a street would need to be built at the expense of <br />the property owners completely within the Dupont Avenue right of way or their private <br />property and in accordance with the requirements of the utility line easement. Beyond <br />the typical platting request and a rezoning, there would also need to be a comprehensive <br />plan amendment to allow the area to be sewered and MUSA would need to be allocated. <br />Lake Drive will need to be expanded in the future to adequately handle traffic, the timing <br />of this expansion is not known at this time; however, the full right of way dedication (60 <br />feet from centerline) is being required at this time to accommodate those improvements. <br />The City Engineer has reviewed the traffic analysis submitted by the applicant and had <br />determined that it adequately addresses the traffic concerns for the project. The <br />recommendations that a northern right turn lane and a southern left turn or bypass lane be <br />added are acceptable. The Anoka County Highway department has not commented on <br />the project at this time. <br />Utilities: The City Engineer has reviewed the project and the comments are <br />attached. Those comments will be addressed as part of the final plat, development <br />agreement, and building permit review processes. <br />• Appropriate drainage and utility easements will need to be shown on both the commercial <br />and residential lots on the final plats for all phases. <br />