Laserfiche WebLink
• <br />4_ fir} -c (4(1,t 2 wJ / 0 <br />RMP -3 <br />CAPROC Issues For Eaglebrook Church <br />Parking Lot Expansion Project <br />2009 <br />8(c) In addition to the BMPs required under 8(b), volume control measures <br />are required reducing runoff by at least the volume from 0.5- inches of <br />rainfall over impervious surfaces on the site (0.5 -inch multiplied by <br />impervious area). Volume reduction required under this paragraph may <br />be achieved only by the following measures: Reestablishment of <br />Effectively Drained Wetlands and Floodplain Meadows Upland <br />Restoration /Conservation, Restoration of Degraded Wetlands, Impervious <br />Disconnection, Soil Amendments/Tilling. (See Accompanying table). <br />8(b) Better Site Design principles will be incorporated and water quantity <br />BMPs (as defined in this Rule) must be incorporated to the following <br />standards: <br />(i) BMP volume must retain the one -year event by providing at <br />least the volume equal to the runoff from a 2.3 -inch, 24 -hour <br />storm over the tributary area within the site under proposed <br />conditions. <br />(1) Infiltration BMPs (see District BMP standard plates and <br />design criteria) are to be incorporated in areas with A & B <br />• hydrologic soil groups. Stormwater from impervious <br />surfaces other than rooftops must be pretreated before <br />discharge to infiltration BMPs, to remove sediment and <br />floatables, or other materials that would restrict the BMP's <br />capacity or contaminate ground water. <br />(2) In the following areas, the volume required by paragraph <br />8(b)(i) is to be provided by bio- filtration features or two -cell <br />wetland treatment systems (see District standard plates and <br />design criteria): <br />(b) Better Site Design principles will be incorporated and water quantity <br />BMPs (as defined in this Rule) must be incorporated to the following <br />standards: <br />(i) BMP volume must retain the one -year event by providing at <br />least the volume equal to the runoff from a 2.3 -inch, 24 -hour <br />storm over the tributary area within the site under proposed <br />conditions. <br />(1) Infiltration BMPs (see District BMP standard plates and <br />design criteria) are to be incorporated in areas with A & B <br />hydrologic soil groups. Stormwater from impervious <br />surfaces other than rooftops must be pretreated before <br />discharge to infiltration BMPs, to remove sediment and <br />floatables, or other materials that would restrict the BMP's <br />capacity or contaminate ground water. <br />(2) In the following areas, the volume required by paragraph <br />• 8(b)(i) is to be provided by bio- filtration features or two -cell <br />wetland treatment systems (see District standard plates and <br />