My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/24/2013 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2013
>
04/24/2013 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:32:58 PM
Creation date
7/8/2014 10:04:46 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/24/2013
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pond seeding and upland seeding mixtures are appropriate for the site. Landscape details <br />show spading machine soil incorporation methods. This should be used on the site for <br />seed bed preparation. Care must be taken in the excavation of ponds and the protection <br />of those ponds during construction to prevent further soil compaction. <br />All proposed ground cover seed mixes are native seed mixes. A long term maintenance <br />plan for the native seed areas (3 -5 years) should be submitted as well as a plan to initially <br />water the native seed during the plant establishment period. <br />Island planting areas should have a minimum of 500 cubic feet provided per tree. This is <br />from the Minnesota Sustainable Communities Guidelines with a recommended 600 -1000 <br />cubic feet per tree requirement. It appears the islands on the site meet this "tree- need" <br />Recycling <br />Recycling containers will be located on the site. <br />RECOMMENDATION <br />Staff recommends approval of the preliminary plat and site plan review including any <br />recommendations of the board. <br />ATTACHMENTS <br />1. Preliminary Plat <br />2. General Layout <br />3. Grading Plan <br />4. Pond Contour Grading Plan <br />5. Erosion Control Plan — Phase 1 <br />6. Erosion Control Plan — Phase 2 <br />7. Landscape Plan <br />8. Electrical Site Photometric Plan <br />9. Lighting Fixture Type <br />10. Native Seed Mix Descriptions <br />11. Recycling Containers <br />4 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.