Laserfiche WebLink
• <br />• <br />• <br />DRAFT — Goals and Strategies <br />Lino Lakes 2030 Comprehensive Plan <br />Page 8 <br />Goal I: Pro t ltertta a ort ation such as blc iztg,: valki , transit and rail. <br />Strategies: <br />1. Support the planning and development of the established Rush Line transit corridor (rail <br />and bus) from the central cities through Hugo. <br />2. Provide local transit opportunities to access the Rush Line corridor. <br />3. Continue to work with Metro Transit to provide and expand safe, affordable and efficient <br />public transit. <br />4. Incorporate, where feasible, bicycle and pedestrian infrastructure and safety standards <br />when planning changes, additions, or maintenance to roads, sidewalks, bridges, paths, or <br />other public facilities. <br />5. Work to physically connect neighborhoods with roads and pedestrian/bicycle links. <br />6. Encourage sidewalks and separated pathways along all arterial collector, and local streets <br />in developing residential and commercial areas. <br />Goal 8: Maintain and coordir <br />County, Washington County, <br />ausportat <br />opolitan Cour <br />system with adjacent <br />MnDOT. <br />es, Anoka <br />Strategies: <br />1. Use the functional classification system to define and plan existing and new roadways. <br />2. Develop and utilize access management guidelines in conjunction with Anoka County. <br />3. Continue to work with surrounding jurisdictions, state and federal agencies to ensure an <br />integrated transportation system. <br />