• <br />• <br />• <br />Planning & Zoning Board <br />March 11, 1998 <br />Page 7 <br />Tom Bruner, 270 Linda Avenue, expressed concerned regarding drainage, as his property <br />is on a septic system. Mr. Ahrens responded that an 8" sewer line, which is standard <br />throughout the City, should accommodate the proposed growth. <br />Mr. Ahrens further explained that during growing season a wetlands delineation will be <br />accomplished, which will determine buildable area. <br />Mr. Herr pointed out that typically buildable area is shown in a preliminary plat approval <br />request. Ms. Wyland explained that the existing pond has been delineated, and that the <br />surveyor was confident that there is adequate buildable area. Mr. Ahrens added that the <br />wetlands do not change in area from year to year, regardless of the weather conditions. <br />Mr. Kirmis suggested that approval be conditioned upon determination of ample <br />buildable area on Lot No. 1. <br />Mr. Dunn suggested that this request be postponed pending determination of adequate <br />sewer capacity and wetland delineation. <br />Tony Sampaire, representative of Mr. Collova, stated that there is not intent to go forward <br />with this project if the conditions outlined above are not met. <br />Chair Schaps asked Mr. Sampaire if there is any financial reason why this project must be <br />approved at this time. Mr. Sampaire responded that there is not, but that the developer <br />would like to go forward as soon as possible. <br />Mr. Ahrens added that any sewer capacity issue was addressed through the addition of a <br />new area lift station. However, he added that further investigation of this issue would <br />take place. <br />Mr. Dunn made a MOTION to close the public hearing at 7:37 p.m., and was supported <br />by Mr. Gelbmann. Motion carried 6 -0. <br />Mr. Herr made a MOTION to table this request until such time as adequate sewer <br />capacity, wetland delineation, and adequate buildable area for Lot 5 are determined, and <br />until such time as the applicant has conducted a neighborhood meeting, and was <br />supported by Mr. Johnson. Motion carried 6 -0. <br />C. Lakeland National Bank, North/West corner of Apollo Drive (extended) & <br />Lake Drive, Site Plan Review <br />Mr. Kirmis explained that Roger Kolstad has submitted a request to construct a 3,600 - <br />square -foot bank on a + 35,400- square -foot parcel of land located north of the proposed <br />extension of Apollo Drive and west of Lake Drive. The subject site is zoned GB (general <br />business), which includes financial institutions as permitted uses. Mr. Kirmis highlighted <br />