Laserfiche WebLink
r7 <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />• <br />July 29, 2002 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: July Maintenance Update <br />The summer softball and soccer programs have thankfully come to a close (yes!). This will <br />allow us to devote more time to improvement projects vs. daily game preparation. <br />Maintenance highlights during a very busy July have included: <br />> Daily ballfield preparation. <br />> Soccer field maintenance. <br />> Weekly garbage collection. <br />> Mowing and trimming of all park areas. <br />> Party wagon delivery and pickup. <br />> Staked trees recently planted in Clearwater Creek Park. <br />> Playground inspections. <br />> Weed whipped boardwalk areas. <br />> City Hall Park Sign — rebuilt planting bed (new landscape block, fabric, and decorative <br />mulch). <br />> Applied summer fertilizer application (same locations as June application). <br />> Irrigation system repair and maintenance. <br />> Core aerification of all athletic fields and irrigated turf. <br />> Tree and stump removal for Timberwolf Trail project (contracted). <br />> Flail mowing of trails and some park areas. <br />And finally, playground installed at Clearwater Creek Park! Park maintenance staff took <br />advantage of dry weather days to complete the install. Work included: <br />> Footing layout. <br />> Digging footings, setting proper depth. <br />> Equipment assembly. <br />> Poured footings. <br />> Completed drain tile (contractor). <br />> Installed fabric liner. <br />> Installed rubber pads and fibar. <br />> Poured concrete sidewalk, bench pads, and gazebo pad (contractor). <br />Work remaining includes backfill of all concrete, bench install, gazebo installation and painting, <br />• reshaping of remaining berms and completion of tree and shrub planting. <br />Those are July's major highlights. See you in August. <br />sw /mike/July 02 Park Update.doc <br />