My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/01/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
11/01/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 2:33:54 PM
Creation date
7/24/2014 12:17:16 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/01/1999
Park Bd Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />City of Lino Lakes <br />Park Board Meeting <br />October 4, 1999 <br />Pat asked if there will be problems replacing the boardwalk when <br />the park is developed. Rick advised the Rice Creek Watershed <br />District has indicated the boardwalk can be replaced because it <br />is a critical connection to an active park. <br />Pam Taschuk made a motion, seconded by Chris Welsand, to remove <br />the boardwalk at Quail Ridge. Motion carried unanimously. <br />Behm's Century Farm Park Development Update - At the July 12, <br />City Council meeting, the Council approved selling 2.55 acres of <br />City property in Behm's Century Farm Park. The proceeds are to <br />be used for development of the remaining park land (6 acres). <br />Mr. Uhde has agreed to provide the following scope of work: <br />• Clearing and grubbing all areas for bike paths and <br />active play areas and removing storm damaged trees and <br />groundf al l . <br />• Install all necessary silt fence and erosion control. <br />• Perform park grading including grading for trails, play <br />area, and drainage. <br />• Tillage of existing soils in all open areas to prepare <br />for seeding. <br />• Installation of trails including 4" sub -base. <br />The estimated project costs of the above listed items is <br />approximately $52,000. Mr. Uhde has agreed to provide a summary <br />of development costs. If total development costs are less than <br />$75,000, Mr. Uhde will submit a cashiers check for the <br />difference. It is anticipated that the additional amount will be <br />used for irrigation, seeding, and paving trails. <br />Rick referred to a grading plan for the park area. The eastern <br />trail is located within a 50' wide strip of park land leading to <br />Mustang Lane. An additional trail connection is also located in <br />the northeastern portion of the park which lines up with the <br />trail connection to the 5th Addition. Rick noted the inside of <br />the trail loop will be leveled and prepared for seeding. Areas <br />outside the trail loop will be kept in its natural state. It is <br />anticipated that the southeastern portion of the park will be <br />kept more of a natural area which may include prairie grass, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.