Laserfiche WebLink
Figure 310 <br />Hotspot Screening Method Flow Chart <br />Subject Project Greater Than <br />The Benchmark AADT? <br />(77.200 AADT) <br />YES <br />NO <br />Project Involves /Affects Short <br />List of 3 MPCA Monitored <br />Locations, Or Top 7 <br />Intersections? <br />Do Hot Spot Analysis <br />NO <br />No Analysis <br />Needed <br />YES <br />23. Stationary source air emissions. Describe the type, sources, quantities and compositions <br />of any emissions from stationary sources of air emissions such as boilers, exhaust stacks <br />or fugitive dust sources. Include any hazardous air pollutants (consult EAW Guidelines <br />for a listing) and any greenhouse gases (such as carbon dioxide, methane, nitrous oxide) <br />and ozone - depleting chemicals (chloro- fluorocarbons, hydrofluorocarbons, <br />perfluorocarbons or sulfur hexafluoride). Also describe any proposed pollution <br />prevention techniques and proposed air pollution control devices. Describe the impacts <br />on air quality. <br />Stationary sources of air emissions will include only natural gas space heaters. The emissions <br />from these units will not have a substantial impact on the ambient air quality. <br />24. Odors, noise and dust. Will the project generate odors, noise or dust during construction <br />or during operation? X Yes _No <br />If yes, describe sources, characteristics, duration, quantities or intensity and any <br />proposed measures to mitigate adverse impacts. Also identify locations of nearby <br />sensitive receptors and estimate impacts on them. Discuss potential impacts on human <br />health or quality of life. (Note: fugitive dust generated by operations may be discussed at <br />item 23 instead of here.) <br />Construction related impacts such as dust, odors and noise have been considered. Some air <br />pollution is expected to be generated during times of construction. These temporary impacts <br />will be present only during construction. The only existing receptors that could experience <br />impacts are those residences located immediately south of the site. Temporary construction <br />Legacy at Woods Edge Development EAW DRAFT 26 <br />Lino Lakes, MN <br />