Laserfiche WebLink
City Council <br />Marshan Lake Industrial Park <br />September 22, 2003 <br />• Drive, and turn lane improvements to Lake Drive. Conditions of approval will <br />include the requirements set forth by Anoka County. <br />• <br />Tree Preservation. A Tree Inventory and Preservation Plan were submitted. <br />Based on the grading plan submitted, the majority of trees on the interior of the <br />property will be removed. However, the majority of trees located adjacent to <br />County Ditch Ten and within the proposed 100 -foot easement will be preserved. <br />A revised Preservation Plan shall be submitted identifying methods of protection. <br />Such plan will be subject to review and approval by the City's Environmental <br />Specialist. <br />Landscaping /Buffer. The Lino Lakes Zoning Ordinance (Sec. 3, subd. 4.Q.1 & <br />Sec. 8, subd. 1.F) specifies that a landscape buffer should be provided along <br />side or rear lot lines for sites located in the Light Industrial District which abut <br />residential or is across the street from a residential zone. Such a strip should be <br />at least 40 feet in width and result in 80% opacity to a minimum height of six (6) <br />feet. Lots 1, and 4 are subject to this requirement. Additionally, the Ordinance <br />(Sec. 8, Subd. 1.F) requires a 40 foot wide landscape buffer area along side and <br />rear lot lines that abut a residential or commercial district (Lot 2). <br />The existing features that will be preserved on the north side of Lot 2, bordering <br />County Ditch Ten, will satisfy this requirement. The eastern side of Lot 2 <br />includes a 12 -foot rise in elevation over the proposed building floor elevation <br />which will, in conjunction with landscaping required as part of site development <br />approvals, result in adequate buffering of the site. <br />A combination of grading (berming) and landscaping is proposed on Lot 1 and <br />Lot 4 adjacent to Lake Drive. Additional screening will be evaluated in <br />conjunction with individual site development. <br />Park Dedication <br />The City will require a payment in lieu of Park Dedication. The park dedication <br />rate is $2,175.00 per acre for Commercial /Industrial Developments. The total <br />park dedication is estimated to be $61,118.00. <br />Individual Site Development. Development on the individual Tots will be subject <br />to the City's Site Plan Review requirements. The City has received application <br />for a Site & Building Plan Review on Lot 2 for a warehouse /distribution facility, <br />which is a permitted use in the LI, Light Industrial District. Staff is currently <br />reviewing this proposal in accordance with the Zoning Ordinance. <br />The proposed 265,000 square foot Panatonni Project includes approximately <br />15,000 square feet of office space. Proposed building materials consists of <br />scored concrete tip -up panels. Three color palettes will be used on the exterior <br />