Laserfiche WebLink
exiting the subdivision will have to use 62nd Street, not all traffic will need to use Ware Road. It <br />is estimated that 6 percent of the a.m. peak hour traffic and 8 percent of the p.m. peak hour traffic <br />generated by the proposed subdivision will use West Shadow Lake Drive. This reduces the site - <br />generated traffic using Ware Road north of 62nd Street to 24 percent during the a.m. peak hour and <br />33 percent in the p.m. peak hour. Site - generated traffic south of 62nd Street or Ware Road is not <br />likely to change with the extension of West Shadow Lake Drive to 62nd Street. <br />The additional traffic contributed by Miller's South Glen on the adjacent roadway system and the <br />West Shadow Lake Drive extension is shown in Figure No. 3. <br />West Shadow Lake Drive Extended to County Road J <br />The directional distribution of the development - generated traffic will further change if West Shadow <br />Lake Drive is ultimately extended to County Road J. Under this scenario, site - generated traffic from <br />the north and south would be able to use either Ware Road or West Shadow Lake Drive and then <br />62nd Street to gain access to the development. Of the 70 percent of the a.m. peak hour site - <br />generated traffic with origins and destinations south of 62nd Street, 35 percent will utilize both Ware <br />Road and West Shadow Lake Drive extended south of 62nd Street. During the p.m. peak hour, an <br />estimated 30 percent of the site - generated traffic will use Ware Road south of 62nd Street, 29 percent <br />will use West Shadow Lake Drive. Site - generated traffic north of 62nd Street is not likely to change <br />from the previous scenario as a result of further extending West Shadow Lake Drive to County <br />Road J. <br />The additional traffic contributed by Miller's South Glen on the adjacent roadway system and the <br />West Shadow Lake Drive extension is shown in Figure No. 4. <br />Potential Area Development <br />In addition to the proposed Miller's South Glen development, there currently exists developable land <br />along 62nd Street that would utilize the adjacent roadway system. This potential area development <br />includes the second addition of Miller's Glen as well as other developable land along 62nd Street. <br />Plat maps and aerial photographs were used to identify the remaining buildable land in the vicinity <br />of 62nd Street. Approximately 70 additional lots were assumed. Figure No. 5 shows the location <br />of the potential area development along 62nd Street. <br />The potential area development along 62nd Street would add an additional 700 trips on an average <br />weekday, 62 trips during the a.m. peak hour, and 71 trips during the p.m. peak hour. The additional <br />traffic generated by the potential area development was assigned to the adjacent roadway system <br />using the same general directional distribution of the Miller's South Glen traffic. Figure Nos., 6, 7, <br />and 8 illustrate the additional traffic contributed by Miller's South Glen and the potential area <br />development on the adjacent roadway system for the existing roadway system, West Shadow Lake <br />Drive extended to 62nd Street, and West Shadow Lake Drive extended to County Road J scenarios, <br />respectively. <br />Miller's South Glen A- LINOL9709.00 <br />Lino Lakes, Minnesota Page 2 <br />