Laserfiche WebLink
7. The City of Lino Lakes standard for cover over 8 -inch watermains is eight <br />feet. <br />8. The applicant must submit drainage computations which verify the rate of <br />runoff from the site has not increased. <br />9. The proposed site and floor plans do not show the proposed catch basin. <br />10. Main Street will be excavated this Summer for the installation of the trunk <br />sanitary sewer and watermain which will impact the traffic flow to and from <br />the site. The applicant should make potential bidders aware of this <br />disruption. <br />11. Erosion control measures will be required for any disturbed areas. <br />If you have any questions regarding the above information, please let me know. <br />2 <br />