MAR- 4 -99 FRI 4:30 PM G.M. DEVELOPMENT <br />FAX NO, 6124249542 P 3 <br />As suggested, some of you may want to remove and transplant some of the trees in the future pond <br />area. <br />No trees will be removed by myself or any of our subcontractors unless it is absolutely necessary <br />to complete our work. It is our intention to save any and all trees that we can. <br />5.) Lot 27 - We will need to meet vith you to see exactly what you need and how best remove the <br />existing haul road. <br />6.) Lot 13 - Replacement of trees lost because of grading would be cost prohibitive. The sale price <br />of a lot could double or more. <br />7.) Lot 9 - We will need to meet with you on the grading of the southwest comer of your lot. With <br />the 5th addition, stone pipe will be extended north and some of that drainage swale will be filled. <br />At that time the stockpiles of topsoil will be used to cover existing road and fill over the extended <br />storm pipe. Any left over will be spread out or removed. <br />8.) Lot 24 - I will be meeting with the owner before the pond excavation starts. <br />9.) Lot 20 - I was not sure what the problem is other than seeing some erosion and hay bales that <br />need to be removed. 1 suggest we talk more when we meet on the pond bank/erosion issues with the <br />other neighbors. <br />10.) Lot 25 - Future pond excavation and any other construction should not be using Palomino or <br />Appalossa other than that necessary to construct the rentaining homes. <br />11.) Lot 11 - Property stakes are placed by the developer eller the grading is complete and <br />previous to selling the lot to the builder. Many tunes property stakes are lost as the home is being <br />constructed and must be replaced. The builder would be responsible to replace any lost property <br />stakes. <br />12.) Lot 15 - Fallen trees are the responsibility of the property owner. The construction debris is <br />the responsibility of the builder or subcontractor. Since it is hard to monitor and enforce, the <br />developer does a clean -up once in the spring and once in the fall. The spring clean -up will take <br />place by May 15th. <br />Sodding of rear yards is the responsibility of the builder or the homeowner, depending how the <br />sales contract reads. <br />Behm's Century Farm covenants are consistent with City of Lino Lakes ordinance. Contact city <br />hall on your concerns for outside storage. They would be the enforcement agency. <br />I hope this helps to answer some questions and start the process to resolution. Please call if you <br />have any questions. <br />Sincerely, <br />Gary Uhde <br />co: John Johnson <br />Mary Kay Wytand <br />Richard Ganunon <br />