Laserfiche WebLink
• <br />• <br />• <br />7. Access to the site during construction should not be allowed through Nancy <br />Drive, it should be limited to 79th Street. <br />8. Any revisions to the proposed grading and drainage plan are contingent upon <br />review by the City. <br />9. Additional catch basins will be required along 79th Street. <br />10. The emergency overflow appears to be oriented toward the undeveloped <br />Highland Meadows. Proper drainage of this site is dependent on the <br />Highland Meadows drainage improvements. <br />11.1 cannot locate the benchmark used as a basis for the elevations provided. <br />12. Finished floor and garage floor elevations fort he building sites are not shown. <br />13.The proposed plan indicates no wetlands are present on the site, this is <br />confirmed by the delineation report from Svoboda Ecological Resources. <br />14. The location of the rock construction entrance is not shown. <br />If you have any questions, please let me know. <br />