My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/13/1999 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1999
>
12/13/1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 11:07:42 AM
Creation date
8/14/2014 1:34:44 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/13/1999
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Majestic Pines Report <br />Page 3 <br />9. Rooftop equipment shall be screened and the screening plan shall be <br />subject to City staff review and approval. <br />10.This approval and the conditions do not imply approval of Phase II. <br />Phase II building and parking requires an amendment to the <br />conditional use permit. <br />11.A sprinkler system with an on -site tank shall be installed for fire <br />protection. <br />12. Exterior color of the structure shall blend with the natural <br />surroundings. <br />13. The final trail location shall be determined in consultation with <br />VLAWMO. <br />Issues Analysis <br />Building <br />The proposed construction of a first phase includes 41,947 square feet of <br />building in two stories; the building footprint is 26,336 square feet. The building <br />is proposed to be constructed of architectural precast concrete panels with stone <br />accent banding and a tinted glass entry feature. <br />The Planning and Zoning Board discussed the exterior colors of the building and <br />requested that the colors to be used be natural and blend in with the area. The <br />applicant has indicated a willingness to work with the City to determine the most <br />appropriate color palette for the area and will be bringing a sample with them to <br />the meeting. <br />The City building code requires a sprinkler system for this building. No public <br />water system is available at this site, so a holding tank is required. The design <br />of the sprinkler system will be reviewed as part of the building permit application. <br />The church currently has 300 members. The facility is designed for their future <br />growth and is a multi -use facility. In addition to two Sunday services the facility <br />will serve as the administrative offices of the church. They also anticipate <br />providing "typical" church activities /services such as teen and youth programs, <br />weddings, funerals and possibly a daycare in the future. They do not intend to <br />have a separate school at the site. The 22 classrooms identified on the floor <br />plans are for religious instruction. <br />Zoning/Conditional Use Permit <br />The site is zoned R -X, Rural Executive District. Religious buildings such as <br />churches are listed as a conditional use in the district provided that: <br />1. Side yard setbacks shall not be less than fifty (50) feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.