My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/27/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
07/27/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 12:06:41 PM
Creation date
8/20/2014 10:28:11 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/27/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ff5VEH <br />CHANGE ORDER <br />3535 VADNAIS CENTER DRIVE 200 SEH CENTER, ST PAUL, MN 55110 612 490 - 2000 800 325 -2055 <br />ARCHITECTURE • ENGINEERING • ENVIRONMENTAL • TRANSPORTATION <br />City of Lino Lakes July 15, 1998 <br />OWNER DATE <br />1 <br />OWNER'S PROJECT NO. CHANGE ORDER NO. <br />Lakes Addition Street Reconstruction A- LINOL9716.04 <br />PROJECT DESCRIPTION SEH NO. <br />The following changes shall be made to the contract documents: <br />Description: <br />To compensate the Contractor in full for all materials and labor to plug hydrant weep holes on disturbed hydrants that <br />are within the ground water table. The work will include installing hydrant plugs and a drain tag on the hydrant. <br />24 hydrants at $75 each = $1,800.00 <br />Purpose of Change Order: <br />This change order is necessary since plugging the drain holes in hydrants is a condition of the Minnesota Department <br />of Health permit which we received after bids for the project were opened. <br />Basis of Cost: 0Actual Estimated: <br />Attachments (list supporting documents) <br />CONTRACT STATUS <br />Original Contract <br />Net Change Prior C. 0.'s 0 to 0 <br />Change this C. O. <br />Revised Contract <br />Recommended for Approval Short Elliott Hendrickson Inc. By <br />Agreed to by Contract • r: <br />BY <br />TITL <br />Distribution Contractor 2 <br />Owner 1 <br />Time Cost <br />$1,787,810.00 <br />0.00 <br />1,800.00 <br />$1,789,610.00 <br />David C. Hahn, • . jest Manager <br />Approved for Owner: <br />BY <br />TITLE <br />Project Representative 1 SEH Office 1 <br />SHORT ELLIOTT <br />HENDRICKSON INC. MINNEAPOLIS, MN ST. CLOUD, MN CHIPPEWA FALLS, WI MADISON, WI LAKE COUNTY, IN <br />EQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.