TAW5LATION OF BIDS
<br />2010 CITY OF LINO PROJECT
<br />CITY OF LINO LAKES, MINNESOTA
<br />TKDA PROJECT NO. 14563.002
<br />BIDS OPENED: MARCH 31, 201010:30 AM
<br />"DENOTES ERROR IN BIDDERS CALCULATION
<br />KNIFE RIVER NORTH BRANCH VALLEY PAVING NORTHWEST ASPHALT
<br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br />W
<br />TKDA
<br />1 n�LJ
<br />mr,u r •rm -rn� uT �v,ioc
<br />T.A. Sch8sky & Sons
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />2010 OVERLAY - PROJECT A (WOODUCK TRAIL FROM MAIN
<br />STREET TO ANDALL STREET)
<br />1
<br />2
<br />MOBILIZATION
<br />1.0
<br />LS
<br />$ 7,050.00
<br />$ 7,050.00
<br />$ 7,550.00
<br />$ 7,550.00
<br />$ 2,650.00
<br />$ 2,650.00
<br />$ 7,900.00
<br />$ 7,900.00
<br />TRAFFIC CONTROL
<br />1.0
<br />LS
<br />$ 500.00
<br />$ 500.00
<br />$ 515.00
<br />$ 515.00
<br />$ 500.00
<br />$ 500.00
<br />$ 515.00
<br />$ 515.00
<br />3
<br />CLEAR AND GRUB TREES (4" DIAMETER OR GREATER)
<br />4.0
<br />EA
<br />$ 200.00
<br />$ 800.00
<br />$ 250.00
<br />$ 1,000.00
<br />$ 250.00
<br />$ 1,000.00
<br />$ 103.00
<br />$ 412.00
<br />4
<br />REMOVE 30" CMP CULVERT
<br />120.0
<br />LF
<br />$ 8.00
<br />$ 960.00
<br />$ 10.50
<br />$ 1,260.00
<br />$ 15.00
<br />$ 1,800.00
<br />$ 8.24
<br />$ 988.80
<br />5
<br />INSTALL 30" RCP CULVERT (TIE ALL JOINTS)
<br />112.0
<br />LF
<br />$ 62.00
<br />$ 6,944.00
<br />$ 65.50
<br />$ 7,336.00
<br />$ 66.50
<br />$ 7,448.00
<br />$ 51.50
<br />$ 5,768.00
<br />6
<br />INSTALL 30" RCP FES
<br />4.0
<br />EA
<br />$ 850.00
<br />$ 3,400.00
<br />$ 1,225.00
<br />$ 4,900.00
<br />$ 715.00
<br />$ 2,860.00
<br />$ 772.50
<br />$ 3,090.00
<br />7
<br />SUBGRADE EXCAVATION
<br />155.0
<br />CY
<br />$ 10.00
<br />$ 1,550.00
<br />$ 14.25
<br />$ 2,208.75
<br />$ 15.25
<br />$ 2,363.75
<br />$ 5.97
<br />$ 925.35
<br />8
<br />GEOTEXTILE STABILIZATION FABRIC
<br />300.0
<br />SY
<br />$ 2.75
<br />$ 825.00
<br />$ 1.15
<br />$ 345.00
<br />$ 1.00
<br />$ 300.00
<br />$ 1.65
<br />$ 495.00
<br />9
<br />SELECT GRANULAR BORROW
<br />155.0
<br />CY
<br />$ 12.00
<br />$ 1,860.00
<br />$ 4.15
<br />$ 643.25
<br />$ 10.00
<br />$ 1,550.00
<br />$ 8.24
<br />$ 1,27720
<br />10
<br />REHABILITATE CATCH BASINS
<br />3.0
<br />EA
<br />$ 525.00
<br />$ 1,575.00
<br />$ 1,175.00
<br />$ 3,525.00
<br />$ 2,200.00
<br />$ 6,600.00
<br />$ 391.40
<br />$ 1,17420
<br />11
<br />RECLAIM BITUMINOUS
<br />12000.0
<br />SY
<br />$ 6.70
<br />$ 8,400.00
<br />$ 0.40
<br />$ 4,800.00
<br />$ 0.52
<br />$ 6,240.00
<br />$ 0.93
<br />$ 11,160.00
<br />12
<br />HAUL OUT EXCESS MILLINGS (LV)
<br />850.0
<br />CY
<br />$ 5.06
<br />$ 4,301.00
<br />$ 5.80
<br />$ 4,930.00
<br />$ 6.00
<br />$ 5,100.00
<br />$ 6.18
<br />$ 5,253.00
<br />13
<br />RESHAPE MILLINGS (3% CROWN)
<br />38.5
<br />RS
<br />$ 102.48
<br />$ 3,945.48
<br />$ 110.00
<br />$ 4,235.00
<br />$ 150.00
<br />$ 5,77500
<br />$ 128.75
<br />$ 4,956.88
<br />14
<br />SAW CUT BITUMINOUS STREET AND DRIVEWAY
<br />370.0
<br />LF
<br />$ 3.00
<br />$ 1,110.00
<br />$ 2.00
<br />$ 740.00
<br />$ 2.00
<br />$ 740.00
<br />$ 1.29
<br />$ 477.30
<br />15
<br />16
<br />SAW CUT CONCRETE DRIVEWAY
<br />80.0
<br />LF
<br />$ 3.00
<br />$ 240.00
<br />$ 3.00
<br />$ 240.00
<br />$ 3.00
<br />$ 240.00
<br />$ 1.29
<br />$ 10320
<br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT
<br />160.0
<br />SY
<br />$ 2.72
<br />$ 43520
<br />$ 5.00
<br />$ 800.00
<br />$ 3.50
<br />$ 560.00
<br />$ 4.12
<br />$ 659.20
<br />17
<br />REMOVE CONCRETE DRIVEWAY PAVEMENT
<br />70.0
<br />SY
<br />$ 3.00
<br />$ 210.00
<br />$ 8.00
<br />$ 560.00
<br />$ 5.00
<br />$ 350.00
<br />$ 4.12
<br />$ 288.40
<br />18
<br />BITUMINOUS BASE COURSE 2360 (LVNW 35030)
<br />1450.0
<br />TN
<br />$ 50.49
<br />$ 73,210.50
<br />$ 50.32
<br />$ 72,964.00
<br />$ 51.30
<br />$ 74,385.00
<br />$ 60.00
<br />$ 87,000.00
<br />19
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />610.0
<br />GAL
<br />$ 2.04
<br />$ 1,244.40
<br />$ 3.00
<br />$ 1,830.00
<br />$ 3.00
<br />$ 1,830.00
<br />$ 2.06
<br />$ 1,256.60
<br />20
<br />BITUMINOUS WEARING COURSE (LVWE 45030)
<br />1100.0
<br />TN
<br />$ 55.34
<br />$ 60,874.00
<br />$ 56.00
<br />$ 61,600.00
<br />$ 56.75
<br />$ 62,425.00
<br />$ 60.00
<br />$ 66,000.00
<br />21
<br />BITUMINOUS CURBING
<br />150.0
<br />LF
<br />$ 6.07
<br />$ 910.50
<br />$ 1.50
<br />$ 225.00
<br />$ 5.00
<br />$ 750.00
<br />$ 6.18
<br />$ 92700
<br />22
<br />BITUMINOUS DRIVEWAY PAVEMENT
<br />160.0
<br />SY
<br />$ 25.33
<br />$ 4,052.80
<br />$ 29.00
<br />$ 4,640.00
<br />$ 21.25
<br />$ 3,400.00
<br />$ 16.48
<br />$ 2,636.80
<br />23
<br />6" CONCRETE DRIVEWAY PAVEMENT
<br />70.0
<br />SY
<br />$ 36.00
<br />$ 2,520.00
<br />$ 37.00
<br />$ 2,590.00
<br />$ 40.00
<br />$ 2,800.00
<br />$ 42.23
<br />$ 2,956.10
<br />24
<br />TOPSOIL BORROW WITH SEED
<br />20.0
<br />CY
<br />$ 29.75
<br />$ 595.00
<br />$ 30.00
<br />$ 600.00
<br />$ 35.00
<br />$ 700.00
<br />$ 20.60
<br />$ 412.00
<br />25
<br />SODDING AND TOPSOIL BORROW
<br />3000
<br />SY
<br />$ 9.95
<br />$ 2,985.00
<br />$ 10.50
<br />$ 3,150.00
<br />$ 9.50
<br />$ 4.00
<br />$ 2,850.00
<br />$ 400.00
<br />$ 5.15
<br />$ 2.58
<br />$ 1,545.00
<br />$ 25800
<br />26
<br />EROISION CONTROL BLANKET WITH SEED
<br />100.0
<br />SY
<br />$ 2.75
<br />$ 275.00
<br />$ 2.85
<br />$ 285.00
<br />27
<br />SILT FENCE
<br />50.0
<br />LF
<br />$ 3.15
<br />$ 157.50
<br />$ 3.25
<br />$ 162.50
<br />$ 8.00
<br />$ 400.00
<br />$ 1.03
<br />$ 51.50
<br />28
<br />BIODEGRADABLE FIBER EROSION CONTROL ROLLS
<br />50.0
<br />LF
<br />$ 3.95
<br />$ 197.50
<br />$ 4.05
<br />$ 202.50
<br />$ 6.00
<br />$ 300.00
<br />$ 2.06
<br />$ 103.00
<br />SUBTOTAL PROJECTA
<br />$ 191,127.88
<br />$ 193,837.00
<br />$ 196,316.75
<br />$ 208,589.53
<br />2010 OVERLAY - PROJECT B (CLEARWATER CREEK FROM
<br />CEDAR STREET TO 270' SOUTH OF ANDALL STREET)
<br />1
<br />MOBILIZATION
<br />1.0
<br />LS
<br />$ 1,000.00
<br />$ 1,000.00
<br />$ 1,300.00
<br />$ 1,300.00
<br />$ 500.00
<br />$ 500.00
<br />$ 1,400.00
<br />$ 1,400.00
<br />2
<br />TRAFFIC CONTROL
<br />1.0
<br />LS
<br />$ 350.00
<br />$ 350.00
<br />$ 360.00
<br />$ 360.00
<br />$ 350.00
<br />$ 350.00
<br />$ 515.00
<br />$ 515.00
<br />3
<br />REPAIR AND ADJUST CATCH BASIN
<br />2.0
<br />EA
<br />$ 550.00
<br />$ 1,100.00
<br />$ 1,050.00
<br />$ 2,100.00
<br />$ 1,100.00
<br />$ 2,20000
<br />$ 463.00
<br />$ 926.00
<br />4
<br />ADJUST MANHOLE
<br />5.0
<br />LF
<br />$ 300.00
<br />$ 1,500.00
<br />$ 275.00
<br />$ 1,375.00
<br />$ 350.00
<br />$ 1,750.00
<br />$ 412.00
<br />$ 2,060.00
<br />5
<br />ADJUST VALVES
<br />3.0
<br />LF
<br />$ 225.00
<br />$ 675.00
<br />$ 275.00
<br />$ 825.00
<br />$ 200.00
<br />$ 600.00
<br />$ 128.75
<br />$ 38625
<br />6
<br />RECLAIM BITUMINOUS
<br />950.0
<br />SY
<br />$ 2.02
<br />$ 1,919.00
<br />$ an
<br />$ 760.00
<br />$ 4.50
<br />$ 4,275.00
<br />$ 1.34
<br />$ 1,273.00
<br />7
<br />HAUL OUT EXCESS MILLINGS (LV)
<br />160.0
<br />CY
<br />$ 6.74
<br />$ 1,078.40
<br />$ 5.80
<br />$ 92800
<br />$ 0.01
<br />$ 1.60
<br />$ 5.15
<br />$ 824.00
<br />8
<br />SAW CUT CONCRETE FOR CATCH BASINS
<br />20.0
<br />LF
<br />$ 3.00
<br />$ 60.00
<br />$ 7.30
<br />$ 146.00
<br />$ 5.00
<br />$ 100.00
<br />$ 1.55
<br />$ 31.00
<br />9
<br />REMOVE OF AND DISPOSE OF CONCRETE CURB
<br />150.0
<br />LF
<br />$ 4.75
<br />$ 712.50
<br />$ 5.25
<br />$ 787.50
<br />$ 7.50
<br />$ 1,125.00
<br />$ 3.09
<br />$ 463.50
<br />10
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />160.0
<br />GAL
<br />$ 2.04
<br />$ 326.40
<br />$ 3.00
<br />$ 480.00
<br />$ 3.00
<br />$ 480.00
<br />$ 2.06
<br />$ 329.60
<br />11
<br />12
<br />BITUMINOUS WEARING COURSE (LVWE 45030)
<br />380.0
<br />TN
<br />$ 61.51
<br />$ 18.00
<br />$ 23,373.80
<br />$ 2,700.00
<br />$ 60.00
<br />$ 18.55
<br />$ 22,800.00
<br />$ 2,782.50
<br />$ 60.85
<br />$ 15.50
<br />$ 23,123.00
<br />$ 2,325.00
<br />$ 60.00
<br />$ 15.45
<br />$ 22,800.00
<br />$ 2,317.50
<br />D412 CONCRETE CURB AND GUTTER
<br />150.0
<br />LF
<br />13
<br />14
<br />SODDING AND TOPSOIL BORROW
<br />30.0
<br />SY
<br />$ 9.95
<br />$ 298.50
<br />$ 10.50
<br />$ 315.00
<br />$ 11.50
<br />$ 345.00
<br />$ 5.15
<br />$ 154.50
<br />BIODEGRADABLE FIBER EROSION CONTROL ROLLS
<br />50.0
<br />LF
<br />$ 3.95
<br />$ 197.50
<br />$ 4.10
<br />$ 205.00
<br />$ 6.00
<br />$ 300.00
<br />$ 2.06
<br />$ 103.00
<br />SUBTOTAL PROJECT B
<br />$ 35,291.10
<br />$ 35,164.00
<br />$ 37,474.60
<br />$ 33,583.35
<br />PROJECT A
<br />$ 191,127.88
<br />$ 35,291.10
<br />$ 193,837.00
<br />$ 35,164.00
<br />$ 196,316.75
<br />$ 37,474.60
<br />$ 208,589.53
<br />$ 33,583.35
<br />PROJECT B
<br />TOTAL PROJECT A AND PROJECT B
<br />$ 226,418.98
<br />$ 229,001.00
<br />$ 233,791.35
<br />$ 242,172.88
<br />Page 2