Laserfiche WebLink
TAW5LATION OF BIDS <br />2010 CITY OF LINO PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14563.002 <br />BIDS OPENED: MARCH 31, 201010:30 AM <br />"DENOTES ERROR IN BIDDERS CALCULATION <br />KNIFE RIVER NORTH BRANCH VALLEY PAVING NORTHWEST ASPHALT <br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />W <br />TKDA <br />1 n�LJ <br />mr,u r •rm -rn� uT �v,ioc <br />T.A. Sch8sky & Sons <br />UNIT TOTAL <br />PRICE AMOUNT <br />2010 OVERLAY - PROJECT A (WOODUCK TRAIL FROM MAIN <br />STREET TO ANDALL STREET) <br />1 <br />2 <br />MOBILIZATION <br />1.0 <br />LS <br />$ 7,050.00 <br />$ 7,050.00 <br />$ 7,550.00 <br />$ 7,550.00 <br />$ 2,650.00 <br />$ 2,650.00 <br />$ 7,900.00 <br />$ 7,900.00 <br />TRAFFIC CONTROL <br />1.0 <br />LS <br />$ 500.00 <br />$ 500.00 <br />$ 515.00 <br />$ 515.00 <br />$ 500.00 <br />$ 500.00 <br />$ 515.00 <br />$ 515.00 <br />3 <br />CLEAR AND GRUB TREES (4" DIAMETER OR GREATER) <br />4.0 <br />EA <br />$ 200.00 <br />$ 800.00 <br />$ 250.00 <br />$ 1,000.00 <br />$ 250.00 <br />$ 1,000.00 <br />$ 103.00 <br />$ 412.00 <br />4 <br />REMOVE 30" CMP CULVERT <br />120.0 <br />LF <br />$ 8.00 <br />$ 960.00 <br />$ 10.50 <br />$ 1,260.00 <br />$ 15.00 <br />$ 1,800.00 <br />$ 8.24 <br />$ 988.80 <br />5 <br />INSTALL 30" RCP CULVERT (TIE ALL JOINTS) <br />112.0 <br />LF <br />$ 62.00 <br />$ 6,944.00 <br />$ 65.50 <br />$ 7,336.00 <br />$ 66.50 <br />$ 7,448.00 <br />$ 51.50 <br />$ 5,768.00 <br />6 <br />INSTALL 30" RCP FES <br />4.0 <br />EA <br />$ 850.00 <br />$ 3,400.00 <br />$ 1,225.00 <br />$ 4,900.00 <br />$ 715.00 <br />$ 2,860.00 <br />$ 772.50 <br />$ 3,090.00 <br />7 <br />SUBGRADE EXCAVATION <br />155.0 <br />CY <br />$ 10.00 <br />$ 1,550.00 <br />$ 14.25 <br />$ 2,208.75 <br />$ 15.25 <br />$ 2,363.75 <br />$ 5.97 <br />$ 925.35 <br />8 <br />GEOTEXTILE STABILIZATION FABRIC <br />300.0 <br />SY <br />$ 2.75 <br />$ 825.00 <br />$ 1.15 <br />$ 345.00 <br />$ 1.00 <br />$ 300.00 <br />$ 1.65 <br />$ 495.00 <br />9 <br />SELECT GRANULAR BORROW <br />155.0 <br />CY <br />$ 12.00 <br />$ 1,860.00 <br />$ 4.15 <br />$ 643.25 <br />$ 10.00 <br />$ 1,550.00 <br />$ 8.24 <br />$ 1,27720 <br />10 <br />REHABILITATE CATCH BASINS <br />3.0 <br />EA <br />$ 525.00 <br />$ 1,575.00 <br />$ 1,175.00 <br />$ 3,525.00 <br />$ 2,200.00 <br />$ 6,600.00 <br />$ 391.40 <br />$ 1,17420 <br />11 <br />RECLAIM BITUMINOUS <br />12000.0 <br />SY <br />$ 6.70 <br />$ 8,400.00 <br />$ 0.40 <br />$ 4,800.00 <br />$ 0.52 <br />$ 6,240.00 <br />$ 0.93 <br />$ 11,160.00 <br />12 <br />HAUL OUT EXCESS MILLINGS (LV) <br />850.0 <br />CY <br />$ 5.06 <br />$ 4,301.00 <br />$ 5.80 <br />$ 4,930.00 <br />$ 6.00 <br />$ 5,100.00 <br />$ 6.18 <br />$ 5,253.00 <br />13 <br />RESHAPE MILLINGS (3% CROWN) <br />38.5 <br />RS <br />$ 102.48 <br />$ 3,945.48 <br />$ 110.00 <br />$ 4,235.00 <br />$ 150.00 <br />$ 5,77500 <br />$ 128.75 <br />$ 4,956.88 <br />14 <br />SAW CUT BITUMINOUS STREET AND DRIVEWAY <br />370.0 <br />LF <br />$ 3.00 <br />$ 1,110.00 <br />$ 2.00 <br />$ 740.00 <br />$ 2.00 <br />$ 740.00 <br />$ 1.29 <br />$ 477.30 <br />15 <br />16 <br />SAW CUT CONCRETE DRIVEWAY <br />80.0 <br />LF <br />$ 3.00 <br />$ 240.00 <br />$ 3.00 <br />$ 240.00 <br />$ 3.00 <br />$ 240.00 <br />$ 1.29 <br />$ 10320 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />160.0 <br />SY <br />$ 2.72 <br />$ 43520 <br />$ 5.00 <br />$ 800.00 <br />$ 3.50 <br />$ 560.00 <br />$ 4.12 <br />$ 659.20 <br />17 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />70.0 <br />SY <br />$ 3.00 <br />$ 210.00 <br />$ 8.00 <br />$ 560.00 <br />$ 5.00 <br />$ 350.00 <br />$ 4.12 <br />$ 288.40 <br />18 <br />BITUMINOUS BASE COURSE 2360 (LVNW 35030) <br />1450.0 <br />TN <br />$ 50.49 <br />$ 73,210.50 <br />$ 50.32 <br />$ 72,964.00 <br />$ 51.30 <br />$ 74,385.00 <br />$ 60.00 <br />$ 87,000.00 <br />19 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />610.0 <br />GAL <br />$ 2.04 <br />$ 1,244.40 <br />$ 3.00 <br />$ 1,830.00 <br />$ 3.00 <br />$ 1,830.00 <br />$ 2.06 <br />$ 1,256.60 <br />20 <br />BITUMINOUS WEARING COURSE (LVWE 45030) <br />1100.0 <br />TN <br />$ 55.34 <br />$ 60,874.00 <br />$ 56.00 <br />$ 61,600.00 <br />$ 56.75 <br />$ 62,425.00 <br />$ 60.00 <br />$ 66,000.00 <br />21 <br />BITUMINOUS CURBING <br />150.0 <br />LF <br />$ 6.07 <br />$ 910.50 <br />$ 1.50 <br />$ 225.00 <br />$ 5.00 <br />$ 750.00 <br />$ 6.18 <br />$ 92700 <br />22 <br />BITUMINOUS DRIVEWAY PAVEMENT <br />160.0 <br />SY <br />$ 25.33 <br />$ 4,052.80 <br />$ 29.00 <br />$ 4,640.00 <br />$ 21.25 <br />$ 3,400.00 <br />$ 16.48 <br />$ 2,636.80 <br />23 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />70.0 <br />SY <br />$ 36.00 <br />$ 2,520.00 <br />$ 37.00 <br />$ 2,590.00 <br />$ 40.00 <br />$ 2,800.00 <br />$ 42.23 <br />$ 2,956.10 <br />24 <br />TOPSOIL BORROW WITH SEED <br />20.0 <br />CY <br />$ 29.75 <br />$ 595.00 <br />$ 30.00 <br />$ 600.00 <br />$ 35.00 <br />$ 700.00 <br />$ 20.60 <br />$ 412.00 <br />25 <br />SODDING AND TOPSOIL BORROW <br />3000 <br />SY <br />$ 9.95 <br />$ 2,985.00 <br />$ 10.50 <br />$ 3,150.00 <br />$ 9.50 <br />$ 4.00 <br />$ 2,850.00 <br />$ 400.00 <br />$ 5.15 <br />$ 2.58 <br />$ 1,545.00 <br />$ 25800 <br />26 <br />EROISION CONTROL BLANKET WITH SEED <br />100.0 <br />SY <br />$ 2.75 <br />$ 275.00 <br />$ 2.85 <br />$ 285.00 <br />27 <br />SILT FENCE <br />50.0 <br />LF <br />$ 3.15 <br />$ 157.50 <br />$ 3.25 <br />$ 162.50 <br />$ 8.00 <br />$ 400.00 <br />$ 1.03 <br />$ 51.50 <br />28 <br />BIODEGRADABLE FIBER EROSION CONTROL ROLLS <br />50.0 <br />LF <br />$ 3.95 <br />$ 197.50 <br />$ 4.05 <br />$ 202.50 <br />$ 6.00 <br />$ 300.00 <br />$ 2.06 <br />$ 103.00 <br />SUBTOTAL PROJECTA <br />$ 191,127.88 <br />$ 193,837.00 <br />$ 196,316.75 <br />$ 208,589.53 <br />2010 OVERLAY - PROJECT B (CLEARWATER CREEK FROM <br />CEDAR STREET TO 270' SOUTH OF ANDALL STREET) <br />1 <br />MOBILIZATION <br />1.0 <br />LS <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 1,300.00 <br />$ 1,300.00 <br />$ 500.00 <br />$ 500.00 <br />$ 1,400.00 <br />$ 1,400.00 <br />2 <br />TRAFFIC CONTROL <br />1.0 <br />LS <br />$ 350.00 <br />$ 350.00 <br />$ 360.00 <br />$ 360.00 <br />$ 350.00 <br />$ 350.00 <br />$ 515.00 <br />$ 515.00 <br />3 <br />REPAIR AND ADJUST CATCH BASIN <br />2.0 <br />EA <br />$ 550.00 <br />$ 1,100.00 <br />$ 1,050.00 <br />$ 2,100.00 <br />$ 1,100.00 <br />$ 2,20000 <br />$ 463.00 <br />$ 926.00 <br />4 <br />ADJUST MANHOLE <br />5.0 <br />LF <br />$ 300.00 <br />$ 1,500.00 <br />$ 275.00 <br />$ 1,375.00 <br />$ 350.00 <br />$ 1,750.00 <br />$ 412.00 <br />$ 2,060.00 <br />5 <br />ADJUST VALVES <br />3.0 <br />LF <br />$ 225.00 <br />$ 675.00 <br />$ 275.00 <br />$ 825.00 <br />$ 200.00 <br />$ 600.00 <br />$ 128.75 <br />$ 38625 <br />6 <br />RECLAIM BITUMINOUS <br />950.0 <br />SY <br />$ 2.02 <br />$ 1,919.00 <br />$ an <br />$ 760.00 <br />$ 4.50 <br />$ 4,275.00 <br />$ 1.34 <br />$ 1,273.00 <br />7 <br />HAUL OUT EXCESS MILLINGS (LV) <br />160.0 <br />CY <br />$ 6.74 <br />$ 1,078.40 <br />$ 5.80 <br />$ 92800 <br />$ 0.01 <br />$ 1.60 <br />$ 5.15 <br />$ 824.00 <br />8 <br />SAW CUT CONCRETE FOR CATCH BASINS <br />20.0 <br />LF <br />$ 3.00 <br />$ 60.00 <br />$ 7.30 <br />$ 146.00 <br />$ 5.00 <br />$ 100.00 <br />$ 1.55 <br />$ 31.00 <br />9 <br />REMOVE OF AND DISPOSE OF CONCRETE CURB <br />150.0 <br />LF <br />$ 4.75 <br />$ 712.50 <br />$ 5.25 <br />$ 787.50 <br />$ 7.50 <br />$ 1,125.00 <br />$ 3.09 <br />$ 463.50 <br />10 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />160.0 <br />GAL <br />$ 2.04 <br />$ 326.40 <br />$ 3.00 <br />$ 480.00 <br />$ 3.00 <br />$ 480.00 <br />$ 2.06 <br />$ 329.60 <br />11 <br />12 <br />BITUMINOUS WEARING COURSE (LVWE 45030) <br />380.0 <br />TN <br />$ 61.51 <br />$ 18.00 <br />$ 23,373.80 <br />$ 2,700.00 <br />$ 60.00 <br />$ 18.55 <br />$ 22,800.00 <br />$ 2,782.50 <br />$ 60.85 <br />$ 15.50 <br />$ 23,123.00 <br />$ 2,325.00 <br />$ 60.00 <br />$ 15.45 <br />$ 22,800.00 <br />$ 2,317.50 <br />D412 CONCRETE CURB AND GUTTER <br />150.0 <br />LF <br />13 <br />14 <br />SODDING AND TOPSOIL BORROW <br />30.0 <br />SY <br />$ 9.95 <br />$ 298.50 <br />$ 10.50 <br />$ 315.00 <br />$ 11.50 <br />$ 345.00 <br />$ 5.15 <br />$ 154.50 <br />BIODEGRADABLE FIBER EROSION CONTROL ROLLS <br />50.0 <br />LF <br />$ 3.95 <br />$ 197.50 <br />$ 4.10 <br />$ 205.00 <br />$ 6.00 <br />$ 300.00 <br />$ 2.06 <br />$ 103.00 <br />SUBTOTAL PROJECT B <br />$ 35,291.10 <br />$ 35,164.00 <br />$ 37,474.60 <br />$ 33,583.35 <br />PROJECT A <br />$ 191,127.88 <br />$ 35,291.10 <br />$ 193,837.00 <br />$ 35,164.00 <br />$ 196,316.75 <br />$ 37,474.60 <br />$ 208,589.53 <br />$ 33,583.35 <br />PROJECT B <br />TOTAL PROJECT A AND PROJECT B <br />$ 226,418.98 <br />$ 229,001.00 <br />$ 233,791.35 <br />$ 242,172.88 <br />Page 2 <br />