Laserfiche WebLink
ESTIMATE NO. 4 (FINAL) <br />dit SURFACE WATER MANAGEMENT PROJECTS <br />OF LINO LAKES, MINNESOTA <br />A COMMISSION NO. 12817 -01 <br />ITEM <br />NO. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />DESCRIPTION <br />BALD EAGLE AND WOODCHUCK CIRCLE <br />MOBILIZATION <br />CLEAR AND GRUB TREES /BRUSH <br />REMOVE EXISTING DRIVEWAY CULVERT <br />12" RCP STORM SEWER (CLASS 5) <br />12" RCP L.R. BEND (CLASS 5) (4' LENGTH) <br />12" RCP F.E.S. WITH TRASH GUARD (CLASS 5) <br />RIP RAP - CLASS II <br />6" AGGREGATE BASE, CLASS 5 <br />SELECT TOPSOIL BORROW (LV) <br />SEEDING AND RESTORATION <br />EROSION CONTROL <br />TRAFFIC CONTROL <br />SUBTOTAL BALD EAGLE AND WOODCHUCK CIRCLE <br />PHEASANT RUN <br />1 MOBILIZATION <br />2 REMOVE/SALVAGE/REPLACE FENCE <br />3 CLEAR AND GRUB TREES /BRUSH <br />4 CLEAN EXISTING STORM SEWER PIPE <br />5 DITCH EXCAVATION <br />6 SODDING AND RESTORATION <br />TOPSOIL BORROW (LV) <br />EROSION CONTROL <br />TRAFFIC CONTROL <br />SUBTOTAL PHEASANT RUN <br />RICE LAKE SCHOOL <br />1 MOBILIZATION <br />2 CLEAR AND GRUB TREES /BRUSH <br />3 DITCH EXCAVATION <br />4 CLEAN EXISTING STORM PIPE <br />5 SEEDING AND RESTORATION <br />6 EROSION CONTROL <br />7 TRAFFIC CONTROL <br />SUBTOTAL RICE LAKE SCHOOL <br />PERIOD ENDING: January 31, 2005 <br />CONTRACT QUANTITY UNIT <br />UNIT QUANTITY TO DATE PRICE <br />AMOUNT <br />TO DATE <br />LS <br />LS <br />LF <br />LF <br />EA <br />EA <br />CY <br />TON <br />CY <br />SY <br />- LS <br />LS <br />LS <br />LS <br />LS <br />LF <br />CY <br />SY <br />CY <br />LS <br />LS <br />1.0 1.0 $ 1,750.00 <br />1.0 1.0 $ 1,200.00 <br />24.0 34.0 $ 10.00 <br />270.0 272.0 $ 47.00 <br />1.0 1.0 $ 300.00 <br />1.0 2.0 $ 630.00 <br />3.0 3.0 $ 120.00 <br />10.0 - $ 22.00 <br />30.0 12.0 $ 12.00 <br />250.0 350.0 $ 4.00 <br />1.0 1.0 $ 100.00 <br />1.0 1.0 $ 300.00 <br />LS <br />LS <br />CY <br />LF <br />AC <br />LS <br />LS <br />1.0 1.0 $ 1,800.00 <br />1.0 $ 500.00 <br />1.0 1.0 $ 600.00 <br />130.0 130.0 $ 6.00 <br />40.0 216.0 $ 26.50 <br />200.0 315.0 $ 8.00 <br />50.0 15.0 $ 1.00 <br />1.0 1.0 $ 100.00 <br />1.0 1.0 $ 1.00 <br />1.0 1.0 $ 3,460.00 <br />1.0 1.0 $ 1,200.00 <br />500.0 852.0 $ 8.68 <br />80.0 - $ 12.00 <br />0.1 0.3 $ 2,500.00 <br />1.0 1.0 $ 300.00 <br />1.0 1.0 $ 1.00 <br />2ND AVENUE (AT ULMER DRIVE) <br />1 MOBILIZATION <br />2 SEDIMENT EXCAVATION <br />3 CLEAR AND GRUB TREES /BRUSH <br />4 SODDING AND RESTORATION <br />5 SELECT TOPSOIL BORROW (LV) <br />6 EROSION CONTROL <br />7 TRAFFIC CONTROL <br />SUBTOTAL 2ND AVENUE (AT ULMER DRIVE) <br />BALDWIN LAKE ROAD - NORTH OF ASH STREET <br />1 MOBILIZATION <br />2 CLEAR AND GRUB TREES /BRUSH <br />03REMOVE EXISTING 60" CMP CULVERT <br />4 60" RCP STORM SEWER (CLASS 2) <br />5 60" RCP F.E.S. (CLASS 2) <br />6 RIP RAP (CLASS III) <br />7 RIP RAP (CLASS II) <br />8 REMOVE BITUMINOUS PAVEMENT (ALL DEPTHS) <br />9 COMMON EXCAVATION (STREET & CULVERT) <br />LS <br />CY <br />LS <br />SY <br />CY <br />LS <br />LS <br />-88- <br />LS <br />LS <br />LF <br />LF <br />EA <br />CY <br />CY <br />CY <br />CY <br />1.0 1.0 $ 2,700.00 <br />50.0 48.0 $ 23.20 <br />1.0 1.0 $ 1,200.00 <br />400.0 455.0 $ 5.00 <br />30.0 15.0 $ 12.00 <br />1.0 1.0 $ 100.00 <br />1.0 1.0 $ 100.00 <br />1.0 1.0 $ 2,400.00 <br />1.0 1.0 $ 1,000.00 <br />55.0 55.0 $ 16.00 <br />36.0 40.0 $ 420.00 <br />2.0 2.0 $ 2,100.00 <br />26.0 26.0 $ 120.00 <br />12.0 12.0 $ 120.00 <br />100.0 96.0 $ 9.00 <br />300.0 264.0 $ 9.00 <br />$ 1,750.00 <br />$ 1,200.00 <br />$ 340.00 <br />$ 12,784.00 <br />$ 300.00 <br />$ 1,260.00 <br />$ 360.00 <br />$ 144.00 <br />$ 1,400.00 <br />$ 100.00 <br />$ 300.00 <br />$ 19,938.00 <br />$ 1,800.00 <br />$ 600.00 <br />$ 780.00 <br />$ 5,724.00 <br />$ 2,520.00 <br />$ 15.00 <br />$ 100.00 <br />$ 1.00 <br />$ 11,540.00 <br />$ 3,460.00 <br />$ 1,200.00 <br />$ 7,395.36 <br />$ - <br />$ 750.00 <br />$ 300.00 <br />$ 1.00 <br />$ 13,106.36 <br />$ 2,700.00 <br />$ 1,113.60 <br />$ 1,200.00 <br />$ 2,275.00 <br />$ 180.00 <br />$ 100.00 <br />$ 100.00 <br />$ 7,668.60 <br />$ 2,400.0C <br />$ 1,000.0C <br />$ 880.0C <br />$ 16,800.0C <br />$ 4,200.0C <br />$ 3,120.0C <br />$ 1,440.0( <br />$ 864.0( <br />$ 2,376.0( <br />