Laserfiche WebLink
Memo Page 3 February 3, 2005 <br />Century Farms North 3rd Addition <br />Engineering Review <br />d.) Sanitary and Storm manhole frame and ring casting shall be Neenah R -1642 with two <br />concealed pick holes. <br />e.) The Developer /Contractor shall provide to the City Engineer two (2) copies of a <br />televised/videotaped sanitary sewer inspection with a written report of all sanitary sewer <br />mainline piping. <br />4. Watermain System Items: <br />a.) Provide to the City a copy of the Minnesota Department of Health (MDH) approval permit <br />prior to construction commencement. <br />b.) On the construction plans, state the following: <br />• Fire Hydrant: Waterous Pacer WB -67 <br />• Gate Valve: RSGV - Mueller A237 -20 <br />• Corporation Stop: Mueller H -15154 Mark II Oraseal <br />• Curb Box: Mueller H -1300 with Minneapolis - top 1.5 MPT <br />c.) Gate Valve Locations: <br />• At the intersection of Robinson Drive and Century Trail, reconfigure the two (2) <br />proposed gate valves as follows: (1) move to and along the 12" DIP on Robinson <br />Drive (Sta. ±24 +10) and the P/L extended on Century Trail. (2) move to and along the <br />12" DIP on Century Trail (Sta. ±38+20) and the P/L extended of Robinson Drive. <br />(Plan Sheet U4 and U5) <br />• At the intersection of Robinson Drive and Shetland Lane (Private), reconfigure the <br />two (2) proposed gate valves as follows: (1) move to and along the 12" DIP to <br />approximately Station 20 +55 on Robinson Drive. (2) move to and along the 8" DIP so <br />that it is between the concrete swale and the R/W on Robinson Drive or approximately <br />Station 0 +25 on Shetland Lane. (Plan Sheet U6) <br />• Add gate valve at connection to existing 8" DIP watermain on Clydesdale Circle at <br />approximately Station 3 +25. (Plan Sheet U8) <br />• At the intersection of Century Trail and Morgan Lane (Private), reconfigure the two <br />(2) proposed gate valves as follows: (1) move to and along the 12" DIP to <br />approximately Station 32 +90 along Century Trail. (2) move to and along the 8" DIP <br />so that it is between the concrete swale and the R/W for Century Trail or <br />approximately Station 10 +10 on Morgan Lane. (Plan Sheets U3 and U9) <br />