Laserfiche WebLink
• <br />• <br />• <br />The comprehensive plan guides the site for Commercial development. The site is within the <br />stage 1 (pre -2010) growth area and within the existing MUSA boundary. Public water and <br />sanitary sewer are available along the south property line and will occupy a portion of the Town <br />Center Parkway alignment. <br />Interim Improvements: <br />The existing Conditional Use Permit allowing fuel sales on the site needs to be modified slightly <br />to allow the facility to properly operate in conjunction with the Lake Drive /Town Center <br />Parkway improvement project, and also to allow for the installation of two additional gasoline <br />pumps. <br />The Lake Drive reconstruction will require the existing pylon sign to be relocated as shown on <br />the plans. Upon completion of the improvements the City and County have worked out an <br />arrangement for one of the existing drives on Lake Drive to be closed immediately and the other <br />to be closed within specific timeframe. These types of site changes also affect the existing <br />Conditional Use Permit and will be clearly outlined in the conditions of approval and subsequent <br />resolution. <br />The Town Center Parkway construction project will provide access to the south side of the site <br />and will require the removal of some curbing and parking area to allow proper circulation. The <br />site will still provide 17 parking spaces which is adequate for the existing facility. <br />The Lino Lakes City Council approved a Conditional Use Permit on the site for the <br />reconstruction of the Motor Fuel Station on May 11, 1992, and an amendment to that <br />Conditional Use Permit on September 27, 1999. This amendment was to allow the two <br />additional pumps that were installed prior to city approval, to be turned on for use by the station. <br />The following conditions were part of the 1999 approval: <br />1. Proper permits are obtained from all affected agencies. <br />2. The City Engineer reviews the ponding survey to confirm compliance. <br />3. Site lighting shall conform to the requirements of the Zoning Ordinance in relation to <br />light and glare and the applicant shall supply a photometric lighting plan to confirm <br />compliance. <br />4. A 6 foot board on board fence shall be installed along the south property line to the <br />south/west corner of the site. Additional evergreens shall be planted along the new fence <br />line to provide a double row of evergreens, 10 feet apart. <br />