Laserfiche WebLink
30 <br />9/11/72 <br />of town. Mr. Locher reported that the deeds for the street were on file as of <br />12/23/49; it is a 66' dedicated roadway but has never been located. Mr. Gotwald <br />said it would be relatively easy to find since it is near the Lino Park and we have <br />a survey on that. Mr. Gotwald suggested that we use a line stake survey on Lois Lane. <br />Mr. 7elinka moved to have Mr. Gotwald do a line stake survey on Lois Lane. Seconded <br />by Mr. Marier. Carried. There was more discussion on the problem of the boats. <br />Mrs. Anderson asked if Mr. LeVesseur would receive notice to move the boats. <br />Mr. Bohjanen told her yes. Mr. Zelinka amended his motion to include having the <br />work done this week. Seconded by Mr. Marier. Carried. <br />Mr. Marier reported that there had been no P&Z meeting but there had been a house <br />moved in the Village without a permit and was in violation of our Ordinance. Mr. <br />Bohjanen had tried to contact the Safeway Movers but had been unable to. The house <br />should be tagged by Mr. Dupre for no building permit, no moving permit and no plumbing <br />permit. <br />Mr. A. Arnold was in the audience and said he had put (R500 down on the house and would <br />buy it to put on his own foundation if permits would be gotten by the movers. He had <br />a percolation test done on his property on Co. Rd. J today. He tisked if the house <br />has passed the inspection. Mr. Dupre said the house was in pretty good shape but needed <br />to be rewired, a new roof, some new plumbing and possibly new siding. Mr. Locher said <br />the last time we had a problem with this mover he was taken to court and was only <br />fined $25.00; maybe he considered ti cheaper to pay the fine then to take out the <br />necessary permits. Mr. Zelinka asked who should contact Safeway Movers; can we direct <br />the Police Chief to contact them? <br />Mr. Zelinka asked if it was necessary for Mr. Arnold to go before the P&Z was told <br />No. Mr. Jaworski asked Mr. Marier his opinion of the house. Mr. Marier replied that <br />it needed to be brought up to date. Mr. Marier said that it does not meet the building <br />code as far as the required square footage is concerned. There would have to be an <br />addition to the house to bring it in line with our building code. The first thing <br />to be done however, is a permit must be obtained by the mover. Mr. Jaworski informed <br />Mr. Arnold that the Village required him to post a performance bond or to deposit 1 1/2 <br />time the cost of repairs with the Village to insure that the work would be done. Mr. <br />Arnold said he was planning to put about $4000 into the house and that he didn't have <br />15000 to put on deposit. He said if he had to go through all that trouble just to <br />forget the whole thing and he left. <br />Glenn Rehbein asked about the house that moved in on Sunset over a year ago and still <br />isn't finished. He thought that we should require these houses to be finished within <br />a certain tine limit or else the contractors ehould be allowed a leeway also. There <br />was discussion on the Ken Gourley house and the time limit will be checked before the <br />next meeting. <br />Mr. Locher said we should issue a citation to Safeway Movers. Mr. Cardinal moved to <br />have the Police to tag the house. Seconded by Mr. Zelinka. Carried. <br />Mr. Marier attended the meeting of the NSSSB and presented a copy of their resolution. <br />The clerk will make copies for the other Council members. They have come up with a <br />new concept of cost worked out by a new formula. This will be discussed further when <br />more information is available. Mr. Jaworski asked if we were not supposed to receive <br />copies of their minutes. Mr. Marier said Yes, but this was the first meeting in about <br />2 1/2 months. <br />Mr. Gotwald reported on the allocation report. There was discussion on this. The <br />Clerk was instructed to make copies of the last portion of the report for the Council <br />members. Mr. Bohjanen asked about the study completion. Mr. Gotwald said it was <br />supposed to have been finished by the middle of August but now he thought it would be <br />finished by the middle of September. Mr. Bohjanen asked if our area qualifies for <br />Metro Benefits more now. Mr. Gotwald said the main issue is the water supply and <br />