Laserfiche WebLink
197 <br />Sept. 19, 1973 <br />Mr. Cardinal had a request from the Park Board for a Mr. Stan Peterson <br />from the Forest Lakes School District to make a presentation to the <br />Council on the Open School plan. The Council requested that the Clerk <br />contact him and ask that he appear at the Sept. 24, 1973 Council meeting. <br />The Park Board had also requested the expenditures for the Park Depart- <br />ment. The Clerk had provided this, and Mr. Cardinal has a copy. <br />There was discussion on the old warming house at Lino Park. The decision <br />of the Council was to salvage reusable materials from the building <br />and to bury the remainder. <br />Mr. Jaworski reported that he had talked with Mr. LeVessuer's son on <br />real ingning the North line of the Park property. Mr. Jaworski had <br />suggested starting at the post by the driveway of the Sport Shop and <br />run a straight line at a slight angle all the way to the East boundary <br />of the Park. This basically would have no effect on the Park. <br />Mr. Zelinka moved to authorize Mr. Jaworski and Mr. Gotwald to meet <br />with Mr. LeVessuer and work out a solution to this problem. Seconded <br />by Mr. Cardinal. Motion carried. <br />Mr. Zelinka moved to ask that Mr. LeVessuer pay the additional <br />Engineering cost, for the deeds and extra legal cost. Seconded by Mr. <br />Cardinal. Motion carried. <br />Mr. Jaworski reported that the work on the roads is completed. He <br />moved that Mr. Gotwald, Mr. Back I i n and he inspect the roads prior to <br />the next Council meeting. Seconded by Mr. Cardinal. Motion carried. <br />Mr. Al Ross, from the audience, thanked the Council for the work done <br />on Ware Road. The work was very much appreciated and the job had been <br />well done. <br />Mr. Marier was absent. <br />Mr. Gotwald had checked the request from North Central for an extension <br />of their gas lines on Pine Street and Maple Street. The extension on <br />Pine Street was not in the driving area and he could see no problem, <br />therefore he would recommend approval of this request. The request <br />for an extension on Maple Street he would recommend approval with the <br />stipulation that North Central be informed that there is a possibility <br />of that line having to be located and maybe moved when work begins on <br />that street. <br />Mr. Zelinka moved to approve these requests with the stipulations noted <br />by the Engineer. Seconded by Mr. Jaworski. Motion carried. <br />Mr. Gotwald had nothing to report on the feasibility report for the <br />Baldwin Lake Area. They have only done some preliminary work. The <br />balance will be completed only when the certainity of the installation <br />of the interceptor is known. He went over some of the main points of <br />the comprehensive sewer plan. The direction of the flow and the size <br />of the lines will remain the same - the location of some lines could <br />