2 <br />COUNCIL MEETING MAY 9, 1994 <br />the residents on the east side of Hodgson Road are interested in <br />water service, now is the time to connect. The assessment for <br />those interested in connecting would be approximately $5,400.00. <br />Construction is anticipated to begin about July 1, 1994. Service <br />for the west side of Hodgson Road would be considerably more <br />expensive due to tunneling under Hodgson Road. There were a few <br />residents from the west side of Hodgson Road who seemed <br />interested until the costs were explained. Mr. Marcellus asked <br />if the drainage would be corrected along with this improvement. <br />Mr. Powell explained that disturbed areas would be corrected but <br />overall drainage correction to the area was not a part of the <br />project. Mr. Powell also explained that property owners on the <br />east side of Hodgson Road would be contacted regarding temporary <br />and permanent easements for the trunk water main and briefly <br />explained the process. <br />Mayor Reinert noted that when construction began on the services <br />down Linda Avenue there was a lack of communication with the <br />residents. However because of this matter the contractor has <br />become more responsive and the residents are very cooperative. <br />Mr. Powell explained that the trunk sewer work is almost complete <br />along Linda Avenue and work on the trunk water main will begin <br />later in the week. He noted that Linda Avenue is passable. <br />Mr. Powell gave a brief background on the water main project. He <br />noted that when the Woodridge Estates area was constructed, the <br />area was connected to the City of Shoreview water system. The <br />joint powers agreement required that the City of Lino Lakes <br />provide service to the area in a specified period of time. With <br />the completion of the water main project along Hodgson Road, the <br />terms of the joint powers agreement will be completed. <br />Mr. Powell used the overhead projector and explained the location <br />of the project. He explained that the project was consistent <br />with the Comprehensive Land Use Plan. The project will <br />eventually be extended and looped up Ware Road or in that area. <br />The estimated construction cost is $127,915.00 and only Fox Trace <br />is proposed to be assessed at this time. The area and unit <br />charges for Fox Trace will be used for the project. <br />Original plans for this project were prepared in 1989. These <br />plans will be reviewed and discussed by staff to determine if <br />they can be used or if they must be redrawn. Construction is <br />expected to begin in July and bids could be ordered at the next <br />City Council meeting. <br />If residents along the east side of Hodgson Road wish to connect <br />to the trunk water main, assessments will be approximately <br />$5,400.00. At this time there are no assessments or service <br />PAGE 5 <br />1 <br />1 <br />