Laserfiche WebLink
COUNCIL MINUTES JUNE 23, 1997 <br />construction of Industrial Boulevard in this location was not necessary. It was noted that Boe <br />Ornamental is currently located immediately east of this proposed construction. The new <br />building is intended for lease with the thought that it may ultimately house Boe's office space. <br />The proposed construction fits with the City's Economic Development Plan calling for incubator <br />space to promote new industrial growth in the community and is supported by EDAAB. The <br />Planning and Zoning Board recommends approval with the following conditions: <br />1. Proper building permits be obtained prior to any construction on the site. The building <br />permit shall include a deposit of 1% of construction costs to insure completion of all site <br />improvements. <br />2. The City Engineer shall review and approve the grading, utility and drainage plans. <br />3. Roof top heating and ventilating units shall be screened and/or blended with the design <br />and coloring of the building. <br />4. The parking area shall be modified as recommended in the staff report to provide better <br />maneuvering room and supplied with adequate handicapped spaces as provided by the <br />ADA Rules and Regulations. This would include increasing the entrance drive to 26' and <br />eliminating 2 to 4 parking spaces near the front entrance drive. <br />5. Permits shall be obtained from the RCWD for grading, if required. <br />6. Signage shall comply with the City Sign Ordinance and proper permits obtained. <br />7. Concrete curb, gutter and bituminous paving shall be provided for all access driveways <br />and parking areas. <br />8. The City Forester and CPTED Officer shall review and approve the landscape plan. <br />9. A lighting plan shall be reviewed and approved by the CPTED Officer. <br />10. The legal description for this site and the adjoining property shall be clarified due to the <br />addition of the vacated Industrial Blvd. right-of-way and a shared driveway agreement <br />signed by the property owner(s). <br />Mr. Wessel reviewed the project and noted it will be available for lease by new businesses and <br />eventually used by Boe Ornamental as their business grows. He also advised this project is being <br />constructed without the benefit of Tax Increment Financing (TIF) since Boe Ornamental is an <br />existing business. He stated staff is supportive of this project and he recommends approval. <br />Council Member Bergeson asked if this project is feasible without sewer and water. Ms. Wyland <br />advised it is not and Boe Ornamental does not want to proceed without the availability of sewer <br />and water. Council Member Bergeson noted the proposed action does not include mention of <br />sewer and water availability. Mr. Wessel stated if those utilities are not available, the project will <br />not proceed. <br />G <br />