COUNCIL MINUTES <br />AUGUST 12, 2002 <br />Joan Tschida stated she was upset by the fact that she had been promised by City staff and the City <br />Councils of both Lino Lakes and Centerville that this project would take place in the fall of 1998. <br />She expressed concern that at this point her business does not have a road and she was also concerned <br />about the increase in cost from 1998 to now. She indicated there is a large pothole at the end of the <br />dirt road and this safety issue needs to be addressed as soon as possible. <br />Councilmember Dahl moved, at 9:56 p.m., to close the public hearing for the 21st Avenue Street and <br />Storm Sewer Improvements. Councilmember O'Donnell seconded the motion. <br />Motion carried unanimously. <br />Mayor Bergeson and the City Engineer reviewed the next steps in this process. <br />Councilmember Carlson requested confirmation that at one poi <br />improvements being extended farther to the south than currently <br />stated this was correct and indicated the length of the project ha <br />project cost. <br />e plans for this project showed the <br />sed. City Engineer Studenski <br />ortened to reduce the overall <br />Community Development Director Grochala further exp <br />proposed in 1998 to extend to Cedar Street. He agree <br />indicated that City staff will continue to move forw <br />stated if one of the property owners wishes to ext <br />will take place at that time. <br />Consideration of Resolution No. 02-90 <br />Lake Drive Street and Utility Improv <br />sealed bids were received and public <br />opening are presented below. City <br />lowest responsible bidder. <br />Contractor <br />Richard Knutson, Inc. <br />S.R. Weidema, Inc. <br />Penn Contracting, Inc. <br />W.B. Miller, Inc. <br />Park Construction Co., Inc. <br />the project had originally been <br />e project had been shortened and <br />s project as currently proposed. He <br />roject, then the process to revise the project <br />gym s Bids and Awarding Contract, West Shadow <br />ents, im Studenski — City Engineer Studenski advised <br />1:00 p.m. on August 1, 2002. The results of the bid <br />is required to award a construction contract to the <br />Engineer's Estimate <br />Amount of Bid <br />$327,809.05 <br />$401,938.77 <br />$409,752.90 <br />$422,902.15 <br />$427,961.30 <br />$302,663.50 <br />City Engineer Studenski noted the low bid is approximately eight percent over the Engineer's <br />Estimate for this project. A copy of the complete bid tabulation is attached. The City required a <br />water main pipe size increase and an extension as part of the trunk system, at a cost of $8,129.00. <br />The trunk water main area and unit charges for this development are approximately $49,000.00, for a <br />total increase to the trunk fund of approximately $41,000.00. The City required the sanitary sewer to <br />be installed at a greater depth and an extension as part of the trunk system, at a cost of $11,846.00. <br />30 <br />