My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/08/2015 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2015
>
04/08/2015 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:19:23 PM
Creation date
4/3/2015 11:38:30 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/08/2015
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blocks and Lots <br />The PUD amendment maintains the original 1 block and 24 lots. There is no increase or <br />decrease in the total numbers of units. A total of 23 units will be constructed on Lots 1- <br />23. Lot 24 is the open space around the individual units. <br />Easements <br />The existing drainage and utility easement over Lot 24 shall be vacated by the City <br />Council. A new standard drainage and utility easement shall be dedicated over the <br />amended Lot 24 with the final plat for Turnberry Crossing 2nd Addition. <br />Storm Water Management and Erosion and Sediment Control <br />A Site Drainage Narrative was prepared by Plowe Engineering, Inc. on March 4, 2015. <br />The proposed development is consistent with the development approved in 2005 with the <br />exception of the larger building footprint. Infiltration requirements under RCWD have <br />been revised since the initial development. The proposed infiltration basins meet the <br />infiltration volume requirements. Drainage patterns are consistent with the original plan. <br />A new RCWD permit is required. <br />The stormwater management plan and SWPPP shall be reviewed by the City Engineer, <br />Environmental Coordinator and Rice Creek Watershed District for compliance. <br />Utilities <br />Public water, sanitary and storm sewer utilities were installed with the original <br />development. No new utilities are proposed. <br />Public Land Dedication <br />Since there is no net change in the number of housing units, no additional park dedication <br />fees are required. <br />Tree Preservation and Mitigation Plan <br />A Tree Preservation and Mitigation Plan is not required since the site has been rough <br />graded and any potential tree removal is within the basic use area (BUA) and the basic <br />use area is not an environmental sensitive area (ESA). <br />Landscaping <br />Landscaping is subject to the original PUD Landscape Plan. The Landscape Plan <br />submitted with the PUD amendment is generally consistent with the original plan. <br />Co <br />
The URL can be used to link to this page
Your browser does not support the video tag.