My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/10/2015 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2015
>
06/10/2015 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:24:32 PM
Creation date
6/8/2015 9:46:59 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/10/2015
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Lots 1-11). There is no increase or decrease in the total numbers of units. A total of 23 <br />units will be constructed on site. <br />Previous Council actions: <br />• Ordinance No. 02-04, Rezoning Property from R-4, High Density Residential to <br />R-3, Medium Density Residential (February 9, 2004) <br />• Resolution No. 04-126, Approving Conditional Use Permit for PUD and <br />Development Stage Plan/Preliminary Plat (September 13, 2004) <br />• Resolution No. 05-30, Approving Final Plat (March 2005) <br />• Resolution No. 15-46, Approving Amendment to PUD Development Stage <br />Plan/Preliminary Plat, Turnberry Crossing (May 2015) <br />This staff report is based on the following plan sets: <br />• Plowe Engineering, Inc. dated May 13, 2015 and received by the City on May 15, <br />2015 <br />• EG Rud & Sons, Inc. dated May 13, 2015 and received by the City on May 15, <br />2015 <br />ANALYSIS <br />PUD Final Plan/Final Plat <br />Council Resolution No. 15-46 approved an amendment to the PUD Development Stage <br />Plan/Preliminary Plat with conditions required prior to approval of the PUD Final Plan - <br />Final Plat. The conditions have been satisfied unless otherwise noted in this report. <br />The final plat is consistent with the amended preliminary plat. <br />Subdivision Ordinance <br />Conformity with the Comprehensive Plan and Zoning Code <br />The PUD Final Plan/Final Plat has been reviewed for compliance with the comprehensive <br />plan, zoning and subdivision ordinance. The proposed development is not considered <br />premature and meets the performance standards of the subdivision and zoning ordinance. <br />Blocks and Lots <br />The final plat of Turnberry Crossing Second Addition modifies Lots 1-11 and Lot 24 of <br />Turnberry Crossing. Turnberry Crossing Second Addition creates Lot 1-12. Lots 1-3 are <br />one story detached townhomes. Lots 4-11 are one story twin homes. Lot 12 is the <br />common open space. There is no increase or decrease in the total numbers of units. A <br />total of 23 units will be constructed on site. <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.