My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-015 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-015 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:29:34 AM
Creation date
7/14/2015 10:36:29 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
02/10/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. All comments from the City Engineer letter dated December 26, 2013 shall be addressed. <br />2. All comments from the Environmental Coordinated Letter dated January 3, 2014 shall be <br />addressed. <br />3. The City will cooperate with the developer to obtain public right-of-way and/or <br />easements for the extension of Fox Road and utilities to the Foxborough development. If <br />acquired, the developer will be responsible for all applicable costs associated with said <br />improvements including land acquisition. <br />4. A Phasing Plan for development shall be included in the plan set. <br />5. Easement documentation for road connections to Old Birch Street and Pheasant Run <br />South shall be provided to the City. <br />6. Conservation easement shall be drafted by the developer and submitted to the City for <br />review and approval. <br />7. Conservation easement language shall include allowance for construction of trails, parks, <br />storm water management facilities, retaining walls, etc. <br />8. Comments/Revision to Sheet CO, Title Sheet: <br />a. Old Birch Street shall be renamed Pheasant Run South as required by emergency <br />services. <br />b. Pine Cone Court shall be renamed to eliminate multiple uses of "Pine" throughout <br />the City. <br />9. Comments/Revision to Sheet C1-1 & C1-2, Preliminary Grading, Drainage & Erosion <br />Plan <br />a. Plan sheet notes sidewalk and bituminous trail by others. Sidewalk and trail shall <br />be installed by developer. <br />b. Sidewalk south of Black Berry Court shall be reviewed by the City Engineer to <br />determine if 8 foot wide bituminous trail is feasible. <br />c. A pedestrian access ramp shall be installed south of Lot 15, Block 1 to provide <br />access to the sidewalk/ trail from Black Berry Court. <br />d. A cost estimate for the trail construction shall be provided. <br />10. Comments/Revision to Sheet 1 of 9, Certificate of Survey with Resource Inventory: <br />a. The applicant shall submit a Letter of Map Revision (LOMR) to FEMA for <br />review and approval. <br />b. The flood elevation shall be determined during the platting process. <br />c. Letter of Map Revision shall be submitted after site grading. <br />d. Lots may require flood insurance until LOMR approved or City may not issue <br />building permits on lots impacted by floodplain until after LOMR approved. <br />11. Comments/Revisions to Sheet 4 and 5 of 9, Preliminary Plat: <br />a. Lots 14 and 15, Block 6 shall not extend into the wetland. <br />b. Lot 15, Block 6 shall have PUD flexibility to allow the rear setback to extend to <br />the conservation easement boundary. <br />c. Lot 1, Block 3 shall be revised so the retaining wall is located entirely within the <br />lot and outside of the standard drainage and utility easement. <br />d. Lot 1, Block 2 shall not extend into the wetland. <br />e. Lot 1, Block 2 shall have PUD flexibility to allow the rear setback to extend to the <br />conservation easement boundary. <br />12. Comments/Revisions to Sheet 7 and 8, Preliminary Landscape and Planting Plan: <br />a. The landscape plan shall include Open Area Landscape calculations as required <br />per ordinance. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.