Laserfiche WebLink
Easements <br />Standard drainage and utility easements at least 10 feet wide shall be provided along all <br />lot lines. Drainage and utility easements shall also be dedicated over stormwater <br />management facilities. Conservation easements shall be required over wetlands and <br />greenway corridors. <br />A 70 foot wide private utility easement extends across the southwest corner of the site. A <br />15 foot wide Access/Maintenance and Trail Easement also extends across the southwest <br />corner of the site. A gravel road exists over this easement for access and maintenance to <br />the existing sanitary sewer main. St. Paul Water Works also owns a 50 foot wide strip of <br />land across the northwest corner of the site. <br />Stormwater Management and Erosion and Sediment Control <br />The concept plan depicts 3 stormwater treatment ponds. The site consists of both A and <br />B/D hydrologic soils which are a combination of drained and un-drained soils. Wilkinson <br />Lake has been designated as an impaired water by the MPCA for nutrients. Based on the <br />approved Total Maximum Daily Load (TMDL) requirements water care should be taken <br />to improve water quality entering the lake. Infiltration of stormwater is required where <br />feasible. The City stormwater management performance standards also dictate that <br />stormwater runoff be conveyed in facilities open to the atmosphere rather than enclosed <br />pipes. The opportunity to connect the proposed pond system with a vegetated corridor <br />rather than pipe should be evaluated. <br />Additional comments: <br />• A stormwater management plan and erosion and sediment control plan in <br />accordance with Chapter 1011 shall be required. <br />Utilities <br />Public water, sanitary and storm sewer utilities will be installed within the development. <br />The site is located in Sanitary Sewer District 4 (Sub -district 4A) and is ultimately served <br />by White Bear Township. An existing gravity and force main sanitary sewer bisects the <br />southwest corner of the site. This was installed to serve the North Oaks Rapp Farms <br />development and is connected with White Bear Township. <br />An existing watermain also bisects the site and serves the North Oaks Rapp Farms. <br />Public water will also be served by White Bear Township. <br />Additional comments: <br />• A Joint Powers Agreement between Lino Lakes and White Bear Township will be <br />required for watermain and sanitary sewer service. <br />5 <br />