Laserfiche WebLink
Ms. Katie Larsen <br />October 8, 2015 <br />Page 2 <br />5. The roadway alignment and profile shall meet MnDOT specifications for a 30 mph roadway <br />or the design speed. <br />6. New access intersections shall meet all City and County site distance requirements. <br />7. The roadway typical section shall meet the City's standard found at: <br />http://www.ci.lino-lakes.mn.us/index.asp?SEC=F5DD7642-AADF-4465 -9 DBA- <br />71 E8F5EC9F8E&Type=B_BASIC <br />Sanitary Sewer and Watermain Comments: <br />The property lies within sewer District 4 which is proposed to be serviced by a White Bear <br />Township trunk sewer line. There is currently a sanitary sewer forcemain that runs through <br />the west side of the site and is pumped into a 10 inch gravity line. This system currently <br />serves the City of North Oak's Rapp farm development. An 18 inch trunk sewer is located in <br />the southeast corner of the site. The City will need to work with White Bear Township to <br />determine the appropriate connection point to serve this property and the remainder of <br />District 4. <br />2. A noted within the Comprehensive Sanitary Sewer Plan a Joint Powers Agreement with <br />White Bear Township will need to be in place for the sanitary sewer service. This agreement <br />will need to identify MCES SAC units and an associated fee structure. <br />3. Water service is also through White Bear Township and as outlined in the City's <br />Comprehensive plan a 12 inch watermain loop will need to be extended through the site. <br />4. The City will need to work with White Bear Township regarding a watermain interconnect at <br />the southeast corner of the site. <br />Storm Sewer and Drainage Comments: <br />1. A stormwater review will be completed with the preliminary plat submittal. <br />2. The City of Lino Lakes Stormwater Ordinance will govern the design requirements for <br />infiltration, rate control and stormwater quality. The watershed, VLAWMO is not a <br />permitting authority for stormwater. <br />3. The minimum storm sewer pipe size shall be 15-inch. <br />4. Wilkinson Lake is an impaired water with a TMDL implementation plan to be coordinated <br />with VLAWMO. <br />5. A 50 foot buffer is required and to be shown around lakes and wetlands. <br />Flood Plain Comments: <br />1. A Base Flood Elevation is required to be determined, using detailed methods acceptable by <br />the Federal Emergency Management Agency (FEMA). This will be used in setting the low <br />floor elevations and for #2 below. <br />2. A FEMA Letter of Map Revision (LOMR) is required for this site. It is highly recommended <br />that the LOMR process be started immediately with a Conditional Letter of Map Revision <br />application. <br />SACommunity Development\ProjeasTi nning Cases\Norfi Oaks Company PUD Concept Plan\Staff Repws\20151014 PZ (Concept Plan)\5 Memo - klarsen - b <br />