My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 40 00 <br />QUALITY REQUIREMENTS <br />PART 1 GENERAL <br />1.01 SUMMARY <br />A. Section Includes <br />1. Information required for conformance to regulatory requirements. <br />2. Quality assurance. <br />3. Procedures to measure and report the quality and performance of the Work. <br />1.02 PRICE AND PAYMENT PROCEDURES <br />A. Measurement and Payment <br />1. All Work and costs of this Section shall be incidental to the Project and included in the <br />Total Base Bid. <br />1.03 REFERENCE STANDARDS <br />A. Whenever reference is made to the Minnesota Department of Transportation <br />Specifications, such reference shall mean "Standard Specifications for Construction," <br />2014 Edition (MnDOT Spec.) and all subsequent revisions and supplements. The word <br />"Engineer" is understood to refer to the Engineer for the Owner. <br />1.04 SUBMITTALS <br />A. Prior to start of Work, submit testing laboratory name for various specified tests for approval <br />by Engineer. <br />B. Laboratory test results or analysis. <br />C. Manufacturer's certificates of quality control or performance. <br />1.05 WORKMANSHIP <br />A. Comply with industry standards of the region, except where more restrictive tolerances or <br />specified requirements indicate more rigid standards or more precise workmanship. <br />1.06 TESTS AND INSPECTIONS <br />A. Conform to the requirements of the General Conditions, except as modified herein. <br />B. Notify Engineer 48 hours prior to expected time for operations requiring tests and <br />inspections. <br />C. Provide incidental labor and facilities to obtain and handle samples at Site or source, <br />transport samples to laboratory, and facilitate tests and inspections for storing and curing <br />of test samples. <br />QUALITY REQUIREMENTS <br />© 2015 Stantec 1 193803415 01 40 00 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.