My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.07 LABORATORY REPORTS <br />A. After each inspection and test, submit 3 copies of Laboratory Report to Engineer. <br />B. Include: Date issued, Project title and number, name of inspector, date and time of <br />sampling or inspection, identification of product and Specifications Section, location in the <br />Project, type of inspection or test, date of test, results of tests, and conformance with <br />Contract Documents. <br />1.08 LABORATORY RESPONSIBILITIES <br />A. Test samples and perform field tests. <br />B. Provide qualified personnel. Cooperate with Engineer and Contractor in performance of <br />services. <br />C. Ascertain compliance with the requirements of the Contract Documents. <br />D. When requested by Engineer, provide interpretation of test results. <br />1.09 LIMITS ON TESTING LABORATORY AUTHORITY <br />A. Laboratory may not release, revoke, alter, or enlarge on requirements of Contract <br />Documents. <br />B. Laboratory may not approve or accept any portion of the Work. <br />C. Laboratory may not assume any duties of Contractor. <br />D. Laboratory has no authority to stop Work. <br />1.10 MANUFACTURER'S CERTIFICATES <br />A. If requested by Engineer, submit manufacturer's certificate with shop drawings certifying <br />that products meet or exceed specified requirements executed by responsible officer. <br />1.11 MANUFACTURER'S FIELD SERVICES <br />A. Provide qualified representative to observe field conditions; conditions of surfaces and <br />installation; quality of workmanship; start-up of equipment; and test, adjust, and balance <br />of equipment. <br />PART 2 PRODUCTS <br />Not Used. <br />PART 3 EXECUTION <br />Not Used. <br />END OF SECTION <br />QUALITY REQUIREMENTS <br />© 2015 Stantec 1 193803415 01 40 00 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.