My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 50 00 <br />TEMPORARY FACILITIES AND CONTROLS <br />PART 1 GENERAL <br />1.01 SUMMARY <br />A. Section Includes <br />1. Temporary utilities and miscellaneous temporary facilities required during construction. <br />B. Products furnished but not installed under this Section or products installed but not <br />furnished under this Section. <br />C. Related Sections <br />1. Section 31 23 00 - Excavation and Fill. <br />1.02 PRICE AND PAYMENT PROCEDURES <br />A. Measurement and Payment <br />1. A Bid Item has been provided for Mobilization. Measurement is Lump Sum. This will be <br />considered payment in full for all work and costs of this Bid Item. The amount of the <br />Lump Sum Bid shall not exceed 5 percent of the Total Base Bid. <br />a. Partial payment of the Lump Sum Bid Item "Mobilization" will be made using a <br />percentage based on the following: <br />2. All other Work and costs of the Section shall be incidental to the Project and included <br />in the Total Base Bid. <br />1.03 REFERENCES <br />A. Minnesota Department of Transportation "Standard Specifications for Construction," <br />2014 Edition (MnDOT Spec.). <br />1.04 SUBMITTALS <br />A. Construction Staging Plan consistent with Section 01 33 00, including the following <br />information: <br />1. Sequence of construction and traffic control. <br />PART 2 PRODUCTS <br />Not Used. <br />TEMPORARY FACILITIES AND CONTROLS <br />© 2015 Stantec 1 193803415 01 50 00 - 1 <br />Cumulative Percent of <br />Mobilization Item Paid <br />First Partial Payment <br />50 <br />Percent of original contract amount earned - 50 <br />75 <br />Percent of original contract amount earned -100 <br />100 <br />2. All other Work and costs of the Section shall be incidental to the Project and included <br />in the Total Base Bid. <br />1.03 REFERENCES <br />A. Minnesota Department of Transportation "Standard Specifications for Construction," <br />2014 Edition (MnDOT Spec.). <br />1.04 SUBMITTALS <br />A. Construction Staging Plan consistent with Section 01 33 00, including the following <br />information: <br />1. Sequence of construction and traffic control. <br />PART 2 PRODUCTS <br />Not Used. <br />TEMPORARY FACILITIES AND CONTROLS <br />© 2015 Stantec 1 193803415 01 50 00 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.