My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.07 Grounds: <br />A. Provide clean-up of building and grounds on a daily basis and dispose of all <br />debris off-site. <br />B. After completion of the project, repair or restore any and all grounds, parking <br />areas and roadways to their original condition prior to project commencement. <br />3.08 Hazardous Materials/Disposal: <br />A. In review of the roof areas by the Architect/Engineer, it was discovered that the <br />existing membrane assembly consisted of an EPDM roof system. <br />B. This information was obtained by the Architect/Engineer by a physical review of <br />the exterior of the building, and by obtaining test cuts from a limited number of <br />locations representative of the membrane assembly. The interior of the structure <br />was not reviewed by the Architect/Engineer to identify any other components of <br />the facility which could contain asbestos or other potentially hazardous products. <br />C. Neither the Owner nor the Architect/Engineer make any representation that the <br />identified potentially hazardous materials are the only potentially hazardous <br />materials incorporated into the roof system, and it is the responsibility of the <br />Contractors bidding the project to identify and verify any hazardous waste <br />material and to include the cost of disposal within their bid price. The Contractor <br />shall be solely responsible for the health and safety of its employees in the <br />handling or removal of potentially hazardous materials. <br />- END OF SECTION - <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />Summary of Work <br />01 11 00-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.