My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Revisions: <br />1. Make all revisions required by the Architect/Engineer. If the Contractor <br />considers any required revision to be a change, he shall so notify the <br />Architect/Engineer as provided for under "changes" in the general <br />conditions. Show each drawing revision by number, date, and subject in a <br />revision block on the drawing. Make only those revisions directed or <br />approved by the Architect/Engineer. <br />G. Revisions After Approval: <br />1. When a submittal has been reviewed by the Architect/Engineer, re- <br />submittal for substitution of materials or equipment will not be considered <br />unless accompanied by an acceptable explanation as to why the <br />substitution is necessary. <br />3.02 Required Submittals: <br />A. Documentation of job site safety: <br />1. Provide evidence of A Workplace Accident and Incident Reduction <br />(AWAIR) program. <br />2. Documentation for person designated as "Competent Person" per <br />Occupational Safety and Health Administration (OSHA). <br />B. Submit shop drawings as detailed in 2.1 for the following: <br />1. Roof -Related Sheet Metal <br />2. Other Sheet Metal <br />C. Manufacturer's Literature: <br />1. Submit product literature on roof membrane and all pertinent accessories <br />supplied by manufacturer. <br />2. Submit product literature on insulation(s), indicating "R" value. <br />3. Submit product literature on all fasteners to be used on project. <br />4. Submit product literature on all caulking and sealants to be used on the <br />project. <br />5. Submit MSDS sheets for hazardous materials. <br />6. Submit a copy of the completed Manufacturer's Pre -Installation Notice. <br />D. Samples: <br />1. Submit two (2) samples of each type of metal to be used on project. <br />- END OF SECTION - <br />Submittal Procedures <br />01 33 00-4 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.