Laserfiche WebLink
D. Keep roof drains and overflow drains in operating condition at the end of each <br />working day. <br />3.02 Removal of Existing Roofing Materials: <br />A. Prior to demolition, inform facility personnel and Architect/Engineer of area and <br />location of work. <br />B. Suitably tarp and protect all interior equipment and products from dust and debris <br />which may filter into interior, if necessary. <br />C. Remove and dispose of all loose gravel. <br />D. Tear off the existing roofing down to the existing roof deck as noted on drawings. <br />E. Tear off all existing base flashings. <br />F. Tear off all existing projection flashings. <br />G. Broom or vacuum surface of existing deck to remove as thoroughly as possible, <br />all dust and debris. <br />3.03 Disposal: <br />A. Properly dispose of all debris on a daily basis. <br />B. Do not store debris on roof. Contractor shall take care not to overload roof deck. <br />3.04 Clean -Up: <br />A. Prior to the completion of the work, remove from the job site all tools, equipment, <br />debris and waste. <br />B. Contractor shall restore to original condition any damage caused during work <br />performed in this Section. <br />C. Conduct final cleaning as per Section 01 74 00 Cleaning and Waste Management. <br />- END OF SECTION - <br />Roof Demolition City of Lino Lakes <br />02 41 19-2 Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />