My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 05 01 30 <br />METAL DECK REPAIR/REPLACEMENT <br />PART 1 - GENERAL <br />1.01 Description: <br />A. Work includes, but is not necessarily limited to: Remove all severely deteriorated <br />decking and replace with new deck to match existing or approved equal. <br />1.02 Quality Assurance: <br />A. Qualifications of workers: Provide sufficient workers and supervisors who shall <br />be present at all times during execution of this portion of the work and who shall <br />be thoroughly familiar with the type of construction involved and the materials <br />and techniques specified. <br />B. Rejections: In the acceptance or rejection of the work, the Architect/Engineer <br />will make no allowance for lack of skill on the part of workers. <br />1.03 Product Handling: <br />A. Delivery and storage: Deliver materials to the job site in original, unopened <br />containers no sooner than five (5) calendar days prior to start of job. Materials to <br />be stored up, off of the roof deck or ground, and covered with a weatherproof <br />covering anchored sufficiently so as to resist wind blow -off. Only those materials <br />necessary to accomplish two days' work are to be stored on the roof. <br />1. Contractor is responsible for all materials delivered to job site until <br />completion of project. <br />2. When storing materials on the roof, do not over -stress deck. <br />B. Protection: Use all means necessary to protect the materials of this Section <br />before, during, and after installation and to protect the work and materials of all <br />other trades. <br />C. Replacements: In the event of damage, immediately make all repairs and <br />replacements to the approval of the Architect/Engineer and at no additional cost to <br />the Owner. <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />Metal Deck Repair/Replacement <br />05 01 30-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.