My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 - PRODUCTS <br />2.01 Metal Deck: <br />A. Steel roof deck shall be primed, painted metal decking. Deck shall conform to <br />ASTM:A611 Grade C, or equal, having a minimum yield strength of 33,000 psi to <br />match existing. <br />B. Steel roof deck shall be as manufactured by U.S. Steel, Vulcraft, Wheeling, or <br />approved equal. <br />PART 3 - EXECUTION <br />3.01 Installation: <br />A. Metal Deck <br />1. Steel roof deck shall be anchored to the structural members directly <br />through bottom of the rib by using self -drilling screws. <br />2. Fasteners shall be a maximum 12" o. c. at ends and intermediate supports <br />of each deck sheet. <br />3. For spans greater than 5 feet, side laps shall be fastened together not <br />exceeding 3 feet center to center between supports. <br />4. Ensure that fasteners do not penetrate conduit or miscellaneous piping <br />located at bottom of the decking. <br />5. Place deck in straight alignment for entire length of run with adjoining <br />deck units. <br />6. Place deck units flat and square, secured to adjacent framing without warp <br />or excessive deflection. <br />7. Cut and neatly fit deck around rooftop projections. <br />3.02 Verification: <br />A. Upon completion of the installation in each area, visually inspect and verify that <br />all components are complete and properly installed. Verify that fasteners are <br />properly located and securely anchored. <br />- END OF SECTION - <br />Metal Deck Repair/Replacement <br />05 01 30-2 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.