Laserfiche WebLink
Section 06 10 53 <br />ROUGH CARPENTRY <br />PART I - GENERAL <br />1.01 Description: <br />A. Work included: Install all wood nailers and plywood as indicated on the <br />drawings. <br />1.02 Quality Assurance: <br />A. Qualifications of workers: Provide sufficient workers and supervisors who shall <br />be present at all times during execution of this portion of the work and who shall <br />be thoroughly familiar with the type of construction involved and the materials <br />and techniques specified. <br />B. Rejections: In the acceptance or rejection of rough carpentry, the <br />Architect/Engineer will make no allowance for lack of skill on the part of <br />workers. <br />1.03 Related Work: <br />A. Section 07 22 16 Roof Board Insulation <br />1.04 Product Handling: <br />A. Delivery and Storage: <br />1. Coordinate storage of materials with Owner and Architect/Engineer. <br />2. Store all materials in an approved manner, up off the roof deck or ground, <br />and protected from exposure to the elements <br />B. Protection: <br />1. Use all necessary means to protect the materials in this section before, <br />during, and after installation, and to protect the work and materials of all <br />other trades. <br />C. Replacement: <br />1. In the event of damage, immediately make all necessary repairs and <br />replacements to the approval of and at no additional cost to the Owner. <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />Rough Carpentry <br />06 10 53-1 <br />