My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 07 62 00 <br />FLASHING AND SHEET METAL <br />PART 1 - GENERAL <br />1.01 Description: <br />A. Furnish and install all coping, flashing and sheet metal work as shown on <br />drawings and herein specified. <br />B. Installation of work shall start not later than 4 working days after a roof section of <br />the re -roofing system, including composition flashings, has been completed. In <br />order to avoid any delays, all work shall be closely coordinated with the roofing <br />work. <br />1.02 Quality Assurance: <br />A. Standards: Comply with standards specified in this section and as listed in the <br />general requirements. <br />B. Qualifications of manufacturer: Products used in the work included in this section <br />shall be produced by manufacturers regularly engaged in the manufacture of <br />similar items and with a history of successful production acceptable to the <br />Architect/Engineer. <br />C. Qualifications of Contractor: The Contractor and contract personnel shall be <br />currently approved by the manufacturer of the approved products as qualified to <br />install the materials of this section. <br />D. Qualifications of Installers: Use an adequate number of skilled installers who are <br />thoroughly trained and experienced in the necessary crafts and who are <br />completely familiar with the specified requirements and the methods needed for <br />proper performance of the work in this section. <br />E. Prior to request for final inspection, contractor shall have inspected all gasketed <br />fasteners and supplied certification letter that all gasketed fasteners were installed <br />and inspected by contractor as per the Contract Documents. <br />1.03 Related Work: <br />A. Drawings and general provisions of the contract apply to this section. <br />B. Related sections: <br />1. Section 07 26 13 Vapor Retarder <br />2. Section 07 31 13 Fiberglass Reinforced Asphalt Shingle Roofing <br />3. Section 07 51 13 Asphalt Built -Up Roofing Gravel Surfacing <br />4. Section 07 53 23 Fully Adhered EPDM Roofing <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />Flashing and Sheet Metal <br />07 62 00-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.