My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/09/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
03/09/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:40:13 PM
Creation date
3/9/2016 3:49:36 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/09/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />A portion of the property is in the shoreland district of Rice Lake. The maximum <br />allowed impervious surface is 60%. The existing school plus the addition are proposed at <br />14.3% impervious. <br /> <br />Public Land Dedication <br /> <br />No cash in lieu of land dedication shall be required with the addition. <br /> <br />Comprehensive Plan <br /> <br />Resource Management System <br /> <br />The Resource Management System Plan goal of preserving surface water quality is <br />supported by the implementation of stormwater management BMP raingarden. <br /> <br />Land Use Plan <br /> <br />The Comprehensive Plan guides this property for civic/institutional use. The proposed <br />school addition is consistent with the designated land use. <br /> <br />Housing Plan <br /> <br />The goals and policies of Housing Plan are not negatively impacted by the school <br />addition. <br /> <br />Transportation Plan <br /> <br />Goals of the Transportation Plan are to ensure that street and roads are as safe as possible <br />and to reduce unnecessary traffic. CSAH 34/Birch Street is a “B” minor arterial road. <br />The school is accessed via two main driveways off of CSAH 34 and there will be no <br />changes to these driveways. The early childhood education program currently operates <br />out of the existing school. There will be no additional students or teachers increasing <br />traffic and no impacts to the traffic levels of service are anticipated. <br /> <br />Regional and local trails exist throughout the school property and no changes will be <br />made to those. <br /> <br />Sanitary Sewer and Water Supply Plan <br /> <br />The site is served by a 16” ductile iron watermain and 12” sanitary sewer line located <br />along CSAH 34/Birch Street which can accommodate the demands of the proposed <br />school addition. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.