My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#08 - At Home Apartments Premin Plat & PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
02-20-24
>
#08 - At Home Apartments Premin Plat & PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 4:02:55 PM
Creation date
3/19/2024 10:11:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> PAGE 3 of 5 <br /> Driveway layout and configuration must be improved for Block 2: Units 8 and 9, and Units 12 and 13. <br />9. Signing and Lighting Plan. The subdivision will require street lights to be installed per city standards at the <br />intersection with 39th Street and at the end of cul‐de‐sac. Revise the plans by removing the photometric <br />numbers from the street surfaces, removing the luminaire schedule, removing the calculation summary <br />table, and removing the street fixture cut sheet. Add plan note to call out the street lights to be as follows: <br /> Street Light Fixture: Traditional Colonial LED, Type B 4000 Lumens (Black). <br /> Street Light Pole: 15‐ft Washington Fluted Black Aluminum Pole. <br />10. Signing and Lighting Plan. Revise No parking signage to include three (3) no parking signs per cul‐de‐sac <br />using the city standard no parking sign, R8‐3 (12” x 12”). Add No Parking sign call out to the plans and add <br />a sign schedule. <br />11. The Street and Storm Sewer Plans must be prepared meeting all city design standards and plan format <br />requirements, including the use of city standard plan notes, details and specifications. <br /> <br />GRADING PLANS, STORMWATER MANAGEMENT AND STORM SEWER SYSTEM <br />1. The proposed development is subject to a Stormwater Management Plan (SWMP) meeting State, Valley <br />Branch Watershed District (VBWD) and city rules. A VBWD permit is required. Storm water facilities <br />proposed as part of the development to meet State and watershed permitting requirements must be <br />constructed in accordance with the City Engineering Design Standards Manual dated January 2022. <br />2. Approval of the Preliminary Plat/Plans for the development is contingent upon all SWMP revisions, as <br />required by the VBWD or other applicable permitting agency, being submitted to the city for review and <br />approval. <br />3. The existing and proposed drainage exhibits must be revised to incorporate all contributing drainage areas <br />(on and off site), and must clearly show and label all points of discharge from the site. No discharge locations <br />have been identified on the exhibits. <br />4. Rate and volume control requirements must be met for all points of discharge from the site. The storm <br />water management plan must be revised as the plan currently shows the discharge to 39th Street storm <br />sewer being exceeded in the post development condition. <br />5. The SWMP must be revised to provide a summary table of the 100‐year HWL elevation for each BMP, and <br />for each catch basin low point. The grading plans must be revised to show the 100‐year HWL elevation at <br />each catch basin low point including the 100‐year HWL contour. A note must be shown with the table <br />indicating that the catch basin low point 100‐year HWL was determined using the limiting inlet capacity and <br />not the pipe capacity. <br />6. The proposed BMP infiltration basin has been placed in Outlot A as required. Outlot A must be dedicated <br />to city ownership for stormwater management. Outlot ownership must be shown on the Preliminary Plat <br />and on the Grading, Utility and Site Plans. The grading plan must be revised to indicate that the storm water <br />basin is an infiltration basin. <br />7. Overland emergency overflow (EOF) elevations are required throughout the site, requiring a system of <br />interconnecting drainage ways. Low openings for adjacent structures must maintain 1‐foot above any <br />adjacent EOF in the as‐built condition. <br />8. Approval of the preliminary grading plans for the development is contingent upon all grading plans being <br />reviewed and approved by the City Engineer prior to the start of any grading or construction. <br /> All drainage swales must be designed to meet a minimum 2% as‐built grade. Design grades must exceed <br />2% to account for construction tolerances. The grading plans must be revised accordingly. <br /> The grading plans must be revised to show the proposed approved grading plan for the Lil Explorers <br />daycare to ensure the two project designs are compatible. <br /> Preliminary plat approval must be contingent upon the 100‐year HWL elevation/contour for all localized <br />low points and catch basins being protected by drainage and utility easement dedicated on the Plat. <br /> Revise the erosion control plans to show double silt fence around all BMPs and all stockpile sites. <br /> Landscaping improvements must be closely coordinated with the preparation of the construction plans <br />to ensure that tree plantings do not encroach drainage swales, EOF flow paths, utility easements, and <br />pond access routes.
The URL can be used to link to this page
Your browser does not support the video tag.