Laserfiche WebLink
    PAGE 2 of 4  <br />the Hudson Boulevard realignment with Manning Avenue will need to be constructed as part of the initial  <br />phases of the development.  <br />6. The alignment of Hudson Boulevard with 2nd Street will require the elimination of the existing Hudson  <br />Boulevard intersection with Manning Avenue as shown on the Limerick Village Infrastructure Plan. These  <br />two intersections cannot coexist as active intersections.  <br />7. The installation of traffic signal(s) will be required as part of the Hudson Boulevard realignment with  <br />Manning Avenue at 2nd Street and at the new intersection of Manning Avenue (CSAH 15) and 5th Street  <br />North. Coordination will be required with Washington County for the construction and implementation of  <br />the new traffic signal(s). A cost contribution should be required from the developer for traffic signal  <br />improvements.  <br />8. The proposed Limerick Parkway connection between 5th Street and the realigned Hudson Boulevard will  <br />be  required  to  be  connected  prior  to  the  development  exceeding 30 units to ensure primary and  <br />secondary access to all developed parcels.     <br />  <br />TRANSPORTATION IMPROVMENTS, ACCESS AND COLLECTOR STREETS    <br />1. Manning Avenue Right‐of‐way Dedication. Prior to the submittal of a preliminary plat application, the  <br />existing right‐of‐way along Manning Avenue (CSAH15) must be fully detailed and any additional right‐of‐ <br />way dedication, if any, must be shown in accordance with the right‐of‐way preservation requirements  <br />from the Washington County Comprehensive Plan.  <br />2. County  Trail.  The  design  and  construction  of  a  bituminous  trail  must  be  incorporated  into  the  <br />development plans, extending along the full length of Manning Avenue (CSAH15) frontage.  <br />3. Hudson Boulevard Realignment. As part of the development, Hudson Boulevard must be realigned to  <br />move the existing Hudson Boulevard/Manning Avenue intersection north approximately 470 feet to align  <br />with the existing Holiday Station driveway (2nd Street North). The full extent of this realignment must be  <br />part of any Preliminary Plat application for the application to be deemed complete.  <br />4. The project narrative and Limerick Village Infrastructure Plan indicates that the relocation of Hudson  <br />Boulevard at Manning Avenue (CSAH15) is consistent with the Four Corners 2nd Addition Plans prepared  <br />by Larson Engineering. Any plan submittal going forward must include the Hudson Boulevard realignment  <br />plans as approved by the city will no deviations, including lane configurations, clear zones, pedestrian  <br />facilities, turn lanes, and typical sections.   <br />5. 5th Street North. Primary or secondary access for the development is shown with the construction of 5th  <br />Street North. The 5th Street North collector roadway alignment is shown to be generally consistent with  <br />the City’s Comprehensive Plan. Alignment details will need to be further evaluated and approved by the  <br />city (and Washington County) prior to the submittal of a preliminary plat application. Additional plan  <br />detail is required to review the proposed alignment at the north property line to verify that there are no  <br />conflicts, including but not limited to conflicts with the existing overhead utilities. The alignment and  <br />termination point at the westerly plat limits for the future extension of 5th Street North will need to be  <br />coordinated with the adjacent property owner. Additional plan detail will also be required to show the  <br />proposed 5th Street North typical sections, including turn lanes at each new intersection internal to the  <br />subdivision. The 5th Street North typical sections will be required to be revised to be consistent with the  <br />approved 5th Street North Engineering Design Standards.  <br />6. Manning Avenue (CSAH 15) Traffic Signal/Turn Lane Improvements at 5th Street North and at Hudson  <br />Boulevard. A traffic signal will be required at the new intersections with Manning Avenue (CSAH 15) and  <br />turn lanes will be required along Manning Avenue (CSAH 15) at each new intersection. Coordination with  <br />Washington  County  in  regards  to  the  timing  and  implementation  of  the  new  traffic  signals  will  be  <br />required.  All  future  plan  submittals  will  need  to  show  the  full extent of the County roadway  <br />improvements.   <br />7. Manning Avenue (CSAH 15) and 5th Street North Intersection. Washington County review of the proposed  <br />intersection  location  will  be  required  prior  to  submitting  for preliminary  plat,  including  turn  lane  <br />configuration requirements along both Manning Avenue (CSAH 15) and 5th Street North.  <br />8. Pedestrian Improvements. The sketch plan must be revised to include the required trail and sidewalk  <br />improvements. Trails must be shown along Hudson Boulevard, 5th Street North, Limerick Parkway, and