Laserfiche WebLink
5 <br />intensive development to accommodate road frontage and utility placement needs for <br />adjacent parcels which may develop simultaneously or later. <br /> <br />I must express concern too about an attempted suggestion that the variance will not <br />involve development on the lot within 12 months and, for that reason, should be <br />denied. It is natural, necessary and reasonable to expect that the construction of the <br />house will follow the eventual placement of a roadway and utilities in the intensive <br />adjacent development. This lot and the small house which will go upon it will serve as a <br />good buffer to that area. Since the Northstar 2nd Addition construction may very well <br />occur within 12 months. However, even if it didn’t, this proposal has the effect of <br />extending City water and sewer to a subdivided parcel which was created at the <br />approval of the City without road frontage. Whether it actually gets built upon within six <br />months or thirteen months, for example, it is of no practical effect. It nevertheless leads <br />to the resolution of proper development at this preexisting, lawful lot. <br /> <br />Second, there is some statement in the Staff Report that the City Engineer’s memo <br />“recommends” denial of the variances. Stated differently, because the creation of the <br />lot without adequate road frontage is now poised to be cured, conditions associated <br />with temporary offsite drainage easements and the provision of a road are addressed <br />simply by requiring them as part of this development and the adjacent Northstar <br />subdivision. In other words, it is not at all uncommon that adjacent subdivisions need to <br />coordinate with an adjacent property, it is only notable here because the Chavez <br />property is comparatively much smaller than the intense development going on next <br />door. <br /> <br />We will submit a stormwater management plan, we will show all drainage and utility <br />easements on the plans, we will provide areas of impervious surface, and offsite <br />grading/construction easements for temporary uses can be imposed and coordinated <br />with the development of the intensive development adjacent to it-Northstar 2. <br /> <br />Examples of pre-existing lots where homes were built are illustrated in the map <br />provided in this packet. All of those homes were built in the 70’s, 80’s and even early <br />90’s. Depictions of these homes are shown in Exhibit B. <br /> <br />The parcel for which we seek variance approvals to build was created in 1980. The <br />property was confirmed by deed on January 16, 1980 and the conveyance specifically <br />confirmed as ”entitled to recording and subdividing” by the City of Lake Elmo (See <br />Exhibit A1 – Stamp bearing approval on deed). Because parcel property is a pre-existing <br />of record and it would not be reasonable or lawful for it to be denied all variances <br />necessary to allow it to be reasonably built upon in the future <br /> <br /> <br /> <br />