Laserfiche WebLink
Memorandum <br />1 <br />TO: Sophia Jensen <br />FROM: Patrick O’Keeffe, PLA <br />DATE: 5/30/2025 <br />RE: 0 Year Landscape Warranty Inspection Acceptance | Crossroads Launch <br /> <br /> Initial <br />Inspection & <br />Reinspection <br />Initial <br />Re-inspection <br />(Acceptance) <br />1-Year <br />Inspection <br />1-Year <br />Re-inspection <br />2-Year <br />Inspection <br />2-Year <br />Re-inspection <br />Final <br />Inspection <br />Acceptance <br />Crossroads Launch <br />07/03/24 <br />09/13/24 <br />09/30/24 <br />10/22/24 05/23/25 <br /> <br />Inspectors <br />• Patrick O’Keeffe, PLA <br />• Leilen Farias <br />Inspection Summary <br />• An on-site landscape inspection was conducted to assess the condition and performance of the <br />installed landscape elements. Based on this review, the site is being granted initial acceptance and the <br />two-year warranty period may now begin. <br />• The landscape installation meets the specifications and intent of the design; however, a few concerns <br />were identified that warrant continued monitoring and require corrective action or plant replacement <br />over the next year. <br />• See attached plan mark-ups for specific landscape conditions noted in this memo. <br />Recommendations <br />• The following items were noted during the inspection and are recommended for monitoring or further <br />action: <br />1. Autumn Fire Sedum Loss <br />A significant number of Autumn Fire Sedum plants have failed to establish. These areas should <br />be reevaluated within the next year to determine whether a replacement with a more suitable <br />species is necessary. <br />2. Powdery Mildew on Ninebark <br />Symptoms of powdery mildew were identified on Ninebark in select locations. Ongoing